This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
Supply Chain and Ports) is adequate to meet the requirements of the NPS EN- 1, Section 5.12.
10.6
EAOL have worked with the promoters of greenhouse development at Great Blakenham (SITA/Sterling Suffolk) to develop a SoCG
Agreed
SITA/Sterling Suffolk and EAOL have developed an engineering solution that will allow the two projects to co- exist. This solution is captured in the Sita SoCG
10.7
It is agreed that there are no other outstanding matters that have not been agreed with respect to Socioeconomics in relation to the Project Application