It has been agreed that the requirements and conditions within the DCO (Version dated 12th July 2013) are sufficient to ensure the avoidance of unacceptable significant Landscape, Seascape and Visual Impacts and that the principles of good design are adhered to as set out within the NPS
7.8
It is agreed that the Important Hedgerow Schedule submitted with the application should be replaced with the revised Schedule presented in the DCO (July 2013).
7.9
The parties agree the contents of the Outline Landscape and Ecological Management Strategy, and the principles of the Draft Section 111/106 Agreement and Outline Converter