There is no objection to the 75m Rochdale Envelope (principles of which are set out NPS EN-1 and EN-3) for the cable route corridor and its construction as a suitable basis for assessment and consent, and specifically there is no objection to the 20m deviation on the maximum 55m working width.
2.12
The parties agree the 35m working width as a maximum working width through all hedgerows with the exception of those identified in Appendix 2 ‘Schedule of Hedgerows’ of the Landscape and Ecological Management Strategy where additional mitigation is proposed
2.13
The provisions of the draft DCO (Version dated 12th July 2013), as they relate to the relevant parties’ interests, are agreed. The parties agree that the provisions of the DCO
Page 19
Agreed
Agreed
No comment
Agreed
Agreed in relation to ecology
Agreed
Agreed
Agreed
Agreed
Agreed in relation to provisions made for landscape and ecology