This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
- Appendix 5: Deben Estuary crossing and adjacent cable route – avoidance of potential for impact on SPA and SSSI
Draft Section 111/106 Agreement Outline Code of Construction Practice Outline Onshore Archaeological Written Scheme of Investigation Converter Station - Geophysical Survey Report Converter Station - Trial Trenching Survey Report Post Submission Report 1 and Supplementary Environmental Information Outline Traffic Management Plan Outline Access Management Scheme Outline Travel Plan Health & Safety Strategy Assessment of Coastal Changes at East Anglia ONE Cable Landfall
Letter in relation to socioeconomics – with ports, skills and supply chain letters annexed Tourism Accommodation Report
1.3 9 The Development
The Application is for development consent to construct and operate the proposed East Anglia ONE Offshore Windfarm, which comprises up to 325 wind turbine generators and associated infrastructure, with an installed capacity of up to 1,200 MW (the Project). The Project would be located in the North Sea approximately 43.4 km from the Suffolk coast at its nearest point. The offshore array site occupies an area of approximately 300 km2.
10
The DCO, if made, would be known as the East Anglia ONE Offshore Windfarm Order. It will comprise the following elements: