EMS MATERIALS SCIENCE & METROLOGY CATALOG 2019–20 EDITION EQUIPMENT & ACCESSORIES
EMS300T T Plus (continued) Cool magnetron sputtering
Sputter coating is a technique widely used in various applications; it is possible to create a plasma and sputter metals with high voltage, poor vacuum and no automation. However, this is not suitable for electron microscopy applications because it can heat the sample and result in damage when the plasma interacts with the sample. The EMS 300T T Plus uses low temperature enhanced-plasma magnetrons optimized for the turbomolecular pump pressures, combined with low current and deposition control, which ensures your sample is protected and uniformly coated.
The EMS 300T T Plus uses easy-change, 57 mm diameter, disc-style targets which are designed to sputter oxidizing and noble metals. The EMS 300T T Plus is fitted as standard with a chromium (Cr) sputter target. Other targets options include; Au, Au/Pd, Pt/Pd, Pd, Pt, Cu, Ir, W, ITO and Al, etc.
Pulsed cleaning for aluminum sputtering Aluminum (Al) rapidly forms an oxide layer which can be difficult to remove. The EMS 300T T Plus has a special recipe for Aluminum that reduces the oxide removal time and prevents excessive pre-sputtering of the target.
Film thickness monitor
The EMS 300T T Plus can be fitted with an optional film thickness monitor (FTM), which measures the coating thickness on a quartz crystal monitor within the chamber, in order to control the coating thickness of material deposited on to the sample.
SPECIFICATIONS Instrument Case
Weight
Packed Dimensions Work Chamber
Display User Interface Specimen Stage
A flat rotation stage for 6”(150mm) and 8” (200mm) wafers is fitted as standard.
A rotating/tilt stage and the ‘rota cota’ rotary tilt stage are also options Vacuum Rotary Pump
4 m3 Turbo Pump
Vacuum Measurement Ultimate Vacuum
Sputter Vacuum Range Processes
Sputter Deposition Current Visual Status Indicator
Triple sputtering head with automatic shutter open
Triple sputtering head with automatic shutter closed
Single target: 1 - 140mA All targets: 60 - 420mA
A large status multi-color indicator light provides a visual indication of the state of the equipment, allowing users to easily identify the status of a process at distance.
The indicator LED shows the following states: • Initialization • Process running • Idle
• Coating in progress • Process completed
• Process ended in fault condition Standard specimen stage
Audio indication also sounds on completion of the process. Services Gases
process gas argon, 99.999% Nominal 5 psi
/hr, two stage rotary pump with oil mist filter for the 300T T Plus Internally mounted 70L/sec air cooled
Pirani gauge as standard, full range gauge available as an option 5 x 10-5 5x10-2
mbar* to 5x10-3 mbar*
*Typical ultimate vacuum of the pumping system in a clean instrument after pre-pumping and venting with dry nitrogen gas
590mm W x 535mm D x 420mm H (maximum height during the opening of the coating head: 772mm) 36 kg (packed: 59kg)
730 mm W x 630 mm D x 690 mm H
Borosilicate glass with integral PET implosion guard Size 300 mm outside diameter x 127 mm High
115.5mm W x 86.4mm H (active area), 640 RGB x 480 (display format), capacitive touch color display
Full graphical interface with touch screen buttons, includes features such as a log of the last 1000 coatings and reminders for when maintenance is due
rotary planetary specimen stage (option)
Specimen stage for glass microscope slides (option)
continued >>>> 189
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198 |
Page 199 |
Page 200 |
Page 201 |
Page 202 |
Page 203 |
Page 204 |
Page 205 |
Page 206 |
Page 207 |
Page 208 |
Page 209 |
Page 210 |
Page 211 |
Page 212 |
Page 213 |
Page 214 |
Page 215 |
Page 216 |
Page 217