Trans RINA, Vol 157, Part C1, Intl J Marine Design, Jan –Dec 2015


wind technology development proposed by TPWind [3] is O&M. Where the key issues are to investigate versatile service fleets and safe access, improve reliability and availability and


d research on full cycle cost models for


optimisation of asset management. The implication beiing that vessels for installation and O&M have to attract the digitally native generation to a new sector, that must compete with land based as well as offshore careers. This was identified as a key rationale for the development of next generation motherships by McCartan et al. [4]. RenewableUK


annual report 1.1 [5] predicts 30,000


employees in the UK offshore wind sector by 2020, contributing £7 billion Gross Value Added each year.


TPM AND ENVIRONMENTAL PSYCHOLOGY


Total Productive Maintenance is based around having zero breakdowns and production losses, and is one of the foundation principles of


the lean production system.


TPM evolved from suppliers to Toyota in Japan to enable them to meet the demands of the TPS [6].TPM is a ph


Department’ although maintenance does have


significant part to play. TPM addresses all the reasons for equipment losses. Consistent standards including Overall Equipment Effectiveness are the basis of the structure, shown in Figure 1, and the pillars that support TPM are:


1 2


. . Autonomous Maintenance: This means that


everyone owns maintenance and that everyone has a role related to maintaining equipment. Effective


Training: The TPM training is


3 . The maintenance fun functional workforce,


ent loop. 4. purpose


ction must effective a


to be


focussed on plant operators so they can detect abnormalities occurs.


in equipment before a breakdown have


a multi- nd before appropriate


PM’s, welll-defined KPI’s and an in built continuous improveme


Early Equ ipment Management: Ensuring equipment is fit for


life of implementation. This


includes effective and informed decision maki during the design process, ensuring the machine operator friendly and understanding the preventative maintenance requirements for the equipment.


ing is


the


The TPM phil losophy promotes training to understand of


po


otential breakdown causes, and the development effective and efficient maintenance strategies that are continuously improved.[7]


The majority of continuous improvement philosophies and tools are derived from the Toyota Production System [6]. The application of a continuous improvement hilosophy to the wind farm maintenance function can only have a positive effect if all stakeholders involved in the deployment and effective Work Flow pr


ph are rocesses are maintained. Therefore the mothership must


hilosophy that does not just focus on the ‘Maintenance a


Figure1: The Five Pillar model of TPM [7] To implement the TPM within


there should be a move to on-line condition based maintenance wherever possible.


n the offshore wind farm, should be


This


supported by autonomation inspection system approach which is efficient and effective for new and developing technologies. Given that both wind turbine and condition monitoring technology are constantly evolving. The mothership and WFSV become the office and plant space respectively for the technicians,, with the mothership also providing an accommodation role. Both spaces must effectively support the culture and work activities. These work activities being a combina


ation of knowledge work


and maintenance activity. A clearly documented work flow need to be developed based on the principles of Lean, Kaizen, TQM and TPM. This will be implemented through rigorous staff training CPD activities when


in pos


g before depl st. The


design


oyment and of


mothership platform as an offshore workplace and accommodation will have to activities and nurture the identifi


 


 


   


facilitate the following fied cultural aspects:


Launch and recovery of 4 x WFSV and 4 x Cabin RIBs


Accommodation and provision to support 4 x12 personWFSV crews for a 3 weeks on/ 3 weeks off maintenance operation at Dogger Bank in the North Sea.


Situational leadership approach respecting the technician.


Promote team work within maintena nce teams Improved morale through providing a positive experience working and living environment Train technicians in TP plant


Recogniti on of all suggestions and achievements for teams and individuals


Environmental psychology is an interdisciplinary field of research that addressed the rela


ationship between humans and their surroundings. The term environment includes: C-110 © 2015: The Royal Instittu ution of Naval Architects PM to condition monitor


Effective communication between all levels of organisation


be designed as a work environment that can support and nurture a culture based on a continuous improvement philo sophy.


the


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204  |  Page 205  |  Page 206  |  Page 207  |  Page 208  |  Page 209  |  Page 210