6. A FC switch fails in a live SAN environment and the replacement spare switch has been delivered. Which two actions should be taken before connecting the spare switch to the SAN? (Choose two) a. Delete all zoning information on the spare switch b. Add the spare switch to the current zone configuration c. Remove the faulty switch from the current zone configuration d. Change the spare switch domain ID to the same as the faulty switch domain ID
e. Ensure that the spare switch domain ID matches an existing switch domain ID in the SAN
7. After you have connected two Fibre Channel switches together what three functions occur during the Fabric Merge process? (Choose three) a. Arbitrate for control of the link b. Distribute the Name Server c. Distribute the active zoneset d. Negotiate the link speed e. Negotiate for the Principal Switch