What Does Lean Production Planning Really Look Like?
Continued from previous page
not be too significant. During preparation for a new product, SMT engineering is rarely
demands and limits the ability to change those decisions. The traditional approach to SMT
material logistics is to create kits of materials for work orders hours in
and are out on the shop floor. This requires a considerable
investment in materials and creates a physical barrier to making plan- ning changes. The prepared materi- als have to be collected and reallocat- ed or returned to the warehouse whenever a schedule change is made. The result is a moratorium in which the immediate schedules are planned with materials assigned and cannot be changed. This moratorium can
that share common setups can reduce this time, but the SMT machine program optimization depends on the material setup matching the layout of components on the PCB. So, when grouping prod- ucts together, the SMT machine pro- gram efficiency can reduce drastical- ly. Planning with Excel can easily incorporate times for existing SMT programs and use the calculated pro- gram times for each product on its
Production planners are challenged to organize the many work order sequences in high-mix manufacturing.
given the time to build in support for alternate configurations or materi- als. The designated programs and groups can be used for a long time. As new models are introduced and old ones become obsolete, perform- ance decreases. Whether the efficiency of the
dedicated product or group is actual- ly meeting the required completion demand is often overlooked. This lim- its choices that could be made by the planning system that might enable lines to better meet completion
advance, following the sequence of work orders on a spreadsheet. This is a result of a history of material inven- tory inaccuracies that lead to unex- pected shortages, which if found at the time of setting the materials at the machine, stop the line from work- ing. The kits of materials created in advance ensure that the machines have everything they need to run in the near-term, allowing time for material issues to be resolved. Unfortunately, this creates the sce- nario where a significant quantity of materials are allocated to production
Valor Production Planning software displays a range of KPIs, including total cost.
extend for days, reducing the oppor- tunity for any planning changes. The setup and verification of
materials that need to change between products on SMT machines takes a long time. Grouping products
designated line. If a planning system were al -
lowed to move a product from one SMT line configuration to another as part of
Continued on next page
Find your parts in seconds with InoAuto
Ultra Lean Material Handling System
Reduce reel storage space by 60%
Reduce material handling time by 70%
Reduce travel time by 60% Increase inventory accuracy
Store 1120 reels in .42 sq. meters Mobile
InoAuto Smart Storage System lights up required parts
ROI
in less than six months
EVALUATION UNITS AVAILABLE NOW
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120