Progetto Project
Anthony Orelowitz, Vivien Yun, Amir Livneh - Paragon Architects
Committente Client
Alexander Forbes
SISTEMA AMBIENTALE SPATIAL SYSTEM
Contesto insediativo Settlement context Urbano Urban
Destinazione Intended use Centro direzionale Office centre
SISTEMA TECNOLOGICO TECHNOLOGICAL SYSTEM
Categoria dell’intervento Category of intervention Nuova costruzione New construction
Tecnica costruttiva Construction technique Industrializzata Industrialised
Applicazione Application
Ambienti Settings
Pavimentazione interna e in parte esterna Internal flooring and part of the external paving
Aree pubbliche pedonali, ingressi, atrii, mensa e bar, passerelle di collegamento in quota, aree pausa e relax, scala a chiocciola Public pedestrian areas, entrances, atria, canteen and bar, elevated connection walkways, break and relaxation areas, spiral staircase.
Tipologia di posa Type of installation
A tutta superfice con lastre sfalsate e inserti con finitura levigata a contrasto Throughout the surface with staggered tiles and inserts with contrasting polished finish
Materiali ceramici Ceramic materials Granitogres
Pietre Rare, Monviso, 60x120 e 10x120 cm; Unicolore, Bianco assoluto, 10x120 cm
Superfici Surfaces
13.000 mq; bocciardato R12 A+B+C, naturale R9, levigato
Distributore Distributor Kenzan
“THE CHOICE OF THE CERAMIC MATERIAL TO USE WAS STRONGLY INFLUENCED BY THE CLIENT’S REQUIREMENTS. OUR CLIENT IS A LEADING PROVIDER OF FINANCIAL SERVICES IN SOUTH AFRICA, CERTAINLY ON THE CUTTING EDGE OF TECHNOLOGY BUT ALSO DEEPLY ROOTED IN THE NATIONAL TERRITORY. WE WERE SPECIFICALLY ASKED FOR A TILE THAT COULD EXPRESS BOTH THIS NATURAL ELEMENT AND TECHNOLOGICAL PROGRESS. THIS CASALGRANDE PADANA PRODUCT DOES THAT BRILLIANTLY SO IT WAS ONLY NATURAL TO CHOOSE IT”. Paragon Architects
The new building on 115 West Street in Johannesburg is the new headquarters of, Alexander Forbes, a South African financial services company. The complex stems from the company’s need to strengthen the group’s organisational structures and improve the use of the work space for about 2500 employees. All this involved the need to modernise the activities and update the services with state-of-the-art techniques, offering great flexibility and the utmost safety at the same time.
When designing this new building, Anthony Orelowitz, Vivien Yun, and Amir Livneh, from Paragon Architects studio, drew the concept from the difficult north-west orientation of the area involved in the intervention (remembering the southern hemisphere location) and the need to comply with the new energy laws in South Africa. The building consists of two parallel blocks connected by a full-height hall. The office centre features south and north-oriented frontages with continuous façades and high thermal performance glazing protected by a brise soleil system. The east and west elevations are characterised by scalloped profiled zinc sheeting. This material oxidises over time acquiring a blue-grey colour. Internally, the two blocks overlook the central volume from where the various levels can be accessed. The entrance atria on the ground floor create a green area, whereas elevated walkways hanging from the roof structure by means of steel tie-rods connect the various offices. Twelve giant 8.4 m cones, which float above the central space like giant clouds protruding from the roof, provide natural light inside the building. In this important connection place, the ceramic floor expands consistently with the dynamic drawings of the walkways, false ceilings, lights, installations and green areas, providing order to the environment. The monochrome and matt finish of the porcelain stoneware plays down the shine and transparency of the glazed walls. This project essentially consists of an office building, which also includes a wide range of facilities for the staff members, such as a nursery, a gym, a six-level car park, a smoking room (which required a separate ventilation system in compliance with the standards in force), a Muslim and multi-faith prayer room, a beauty salon, a health studio with physiotherapist, a 200-seat auditorium, state-of-the-art audio- visual meeting rooms, a multi-purpose room, staff-training halls, a kitchen, a canteen, a café, a bar, and a cellar. The work environments include large relaxation areas that stand out for their accurate chromatic design. The outdoor areas are planted with native low-water trees. The building has been accredited with a 4 Star Green Star Design V1 rating, due to its high energy efficiency. In fact, the building is provided with a passive heating system, fan coil cooling systems, and waste water recycling systems for watering the plants and cleaning the bathrooms.
13,000 sq.m; bocciardata R12 A+B+C, matt R9, polished
38
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188