Page 28
www.us-
tech.com
February, 2020
ElEctronic Mfg Products CAMI and Doyle Release
ZIF Light Director Fixtures
Acton, MA — CAMI Research and Doyle Manufac- turing have released zero insertion force (ZIF) light director fixtures, providing CableEye® users with increased options for light-guided assem- bly of connectors. CAMI’s Light Director™ system is a Ca-
bleEye accessory that provides a computer- guided technique for assembling connectors used in aerospace, medical and other high-reli- ability applications. This system uses LED-lit fibers to individually illuminate target cavities in the connector being assembled. When the technician enters the wire code
printed on unconnected wires, or touches a wire connected to the other end, the CableEye software turns on the appropriate fiber. This causes a bright, flashing light to project from inside the target cavity, guiding the technician to the proper insertion point. Correct insertion is confirmed by the elimination of light from that location, whereas insertion into an incor- rect location leaves the flashing light visible. Using synthetic speech, Light Director
can read the pin number to the technician, fur- ther reinforcing the target location. Speech can be activated in English, Spanish, French, Ger- man, Chinese, Japanese, Korean, Polish, or Turk- ish when a matching generic voice font has been downloaded. Speech recognition is also available as an op- tion permitting the technician to speak wire codes to
CableEye ZIF Light Director fixture.
be identified during the assembly process by numer- ic code, barcode, color code, or if no codes are present, by electrical detection using a wrist strap if the far end of the cable has already been assembled and can be electrically connected to the system.
the system, eliminating the need for a keyboard or monitor. Normally, technicians crimp pins on wires in advance of assembly to the connector. Wires may
Field testing has shown that the Light Direc-
tor greatly increases accuracy and assembly rate over manual methods, while nearly eliminating er- rors. Because the Light Director greatly re- duces the perceptual challenge of manually lo- cating pin cavities in a complex connector, tech- nician fatigue is greatly reduced, permitting a continuous, high productivity rate throughout the workday. The new zero insertion force Light Direc-
tor fixtures allow for easy and rapid connection and disconnection of the connector being as- sembled so even greater productivity can be achieved. The connector simply slides into place — threaded connectors are not screwed onto the mating interface. Press the top of the fixture lightly to lock, and the lever to release. Customers can order both Light Director
(for light-guided assembly) and electrical test versions of these fixtures. The two types of blocks can be placed next to each other so that the customer can assemble on the Light Direc- tor block and then quickly move the UUT to the other for the electrical test. Or the customer can have them at entirely different stations on
the production line. Contact: CAMI Research, Inc.,
42 Nagog Park, Suite 115, Acton, MA 01720 % 978-266-2655
E-mail:
sales@camiresearch.com Web:
www.camiresearch.com
MODEL 902 BURN-IN BOARD TRANSFER HANDLER
• Handles 1,000 units per hour with a 10 sec. program time • Uses standard 4 site programmers with standard open top sockets • All sockets individually aligned under software control • Tape/Tray/Tube input
Tape/Tray output • Simple and quick changeover
Visit Exatron at IPC/APEX Expo 20 Booth #2
www.exatron.com 1-800-EXA-TRON 1-408-629-7600
See at IPC APEX, Booth 2613
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144