search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Melco is currently developing the remaining project for Studio City which will consist of two hotel towers with 900 rooms approximately, cineplex, MICE, gaming area and water park. Prior to the Covid-19 outbreak the


company anticipated a 32 month build time. However the project exists under the terms of a land concession which has to be fully completed by May 2022.


2009 and includes four hotels with a total of 2,230 suites and rooms between them. Te gaming area has 516 tables and 862 slots plus around 35 restaurants on the complex plus shopping and nightclub. In 2018 Melco opened Morpheus the third phase of City of Dreams with 770 rooms and suites. Total operating revenue for City of Dreams by end 2019 was US$3.05bn (53 per cent of total group net revenues). Operating revenue for H1 2020 was US$573m ($1.5bn in H1 2019).


Altira Casino is a luxury resort in Taipa with a 38 storey hotel tower offering 230 rooms and suites. Gaming area offers 103 tables and 178 slots located in the Mocha Club Altira. Total operating revenues for 2019 were US$465.1m (eight per cent of total group net revenues). H1 2020 operating revenues were $69.9m ($237.3m in H1 2019).


Studio City is a large scale resort on Cotai which opened in 2015 operating a four star hotel, shopping and entertainment area and attractions. Te gaming area has 295 tables and 947 slots. Studio City focuses on mass market gaming although VIP rolling chip operations were introduced in 2016 and a VIP rolling chip area was built with up to 45 VIP tables authorised from December 2019 which are due to cease by January 2021. Total operating revenues in 2019 were US$1.35bn (23.6 per cent of total group net revenues). H1 2020 operating revenues were US$147.5m (US$659.3m in H1 2019).


Melco is currently developing the remaining project for Studio City which will consist of two hotel towers with 900 rooms approximately, cineplex, MICE, gaming area and water park. Prior to the Covid-19 outbreak the company anticipated a 32 month build time. However the project exists under the terms of a land concession which has to be fully completed by May 2022 and if not could cause an issue with the Macau government if an extension is not granted.


total revenues of HK2.4bn. Overall occupancy was 19.8 per cent. MGM Macau saw a total GGR of HK$1.3bn and MGM Cotai with HK$1.1bn.


As part of their business re-launch MGM has introduced the Mixy-Go-Matchy offerings to include bespoke hospitality packages, enhanced food and drink options and entertainment.


At the end of July, Hubert Wang, President and CEO of MGM China said: “We are encouraged to see the lifting of quarantine measures for visitors from Macau into Guangdong province as


an important first step of business normalisation.


“While we focus to contain our costs, we are rolling out programs to drive traffic and prepare for gradual recovery. Te trend setting holistic non gaming offerings at both MGM Macau and MGM Cotai have been well received. We are confident about the prospects of Macau gaming and hospitality market in a longer term.”


Finally Melco Resorts operates the iconic City of Dreams which is located in Cotai and opened in


Mocha Clubs began operating in 2003 and today there are eight clubs with 1,478 slots. Tey are mostly located within four and five star hotels and offer electronic tables and slots. Total operating revenues in 2019 were US$117.5m (two per cent of total group net revenues.) Mocha operating revenues for H1 2020 were US$41.2m compared to US$60m for H1 2019.


Melco H1 2020 results for the Macau casinos amounted to HK$6.5bn compared to HK$19.4bn during the same half year period in 2019.


A statement said: “We remain bullish on the long term growth prospects of the group.


NEWSWIRE / INTERACTIVE / MARKET DATA P93


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144