This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
Project: A2953 Client: East Anglia Offshore Wind Limited Title:
East Anglia THREE– Navigation Risk Assessment 14 Commercial Ferry Operators and Activity
166. Figure 14.1 presents vessel tracks of commercial ferries recorded during the 40 day survey period colour-coded by operator. Following this, Table 14.1 summarises commercial ferry operations recorded operating in proximity of the East Anglia THREE site, including the number of vessels operating on each route per day.