This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
would be very visible to shipping with lights on significant peripheral structures as well as selected intermediate structures in accordance with THLS requirements (see Section 5).
455. 456. It is therefore considered that, provided suitable marking and lighting would be
developed at the East Anglia THREE site, it would not degrade the ability of vessels to navigate in the area through visual impairment.
It is also noted that the windfarm does not impact on any other pre-established navigational aids.
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1