This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
Figure 3.4 Offshore cable corridor associated with the East Anglia THREE Project
24. The proposed cable corridor runs for approximately 70nm west and south from the western boundary of the East Anglia THREE project making land fall to the north of Felixstowe, at Bawdsey (Suffolk).
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1 Page: 9