Figure 18.15 Anticipated Routeing for Route 19 Post Construction of the Proposed East Anglia THREE Project
254. The worst case deviation for vessels on this route is estimated to be approximately 3.42nm (2.69% of route length) for vessels transiting south of the East Anglia THREE site whilst on passage outbound from Amsterdam. A deviation of 2.53nm (1.98% of route length) is anticipated for inbound transiting vessels to Amsterdam on this route.
255. Based on experience of shipping behaviours around existing offshore renewable projects it is anticipated that a proportion of vessels would pass in closer proximity to the site. This assumes that ships would be able to pre-plan their revised passage in advance of
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1 Page: 112