Project: A2953 Client: East Anglia Offshore Wind Limited Title:
East Anglia THREE– Navigation Risk Assessment 12 Changes to Routeing Measures within Dutch Waters
130. On the 1st August 2013 the routeing measures in Dutch waters were updated. A new TSS has been introduced as well as revisions made to existing schemes. These changes would also have effects on routes passing through the East Anglia THREE site. Figure 12.1 and Figure 12.2 present the changes to the routeing measures in the area and section 15 shows where routes have initially been deviated by changes in the routeing measure and then by the development of the proposed East Anglia THREE project.