Figure 28.1 Anticipated Routeing for Route 16 Post Cumulative Scenario
470. Throughout the 100% fill build scenario of the East Anglia THREE site and East Anglia FOUR site, it is likely that vessels would transit to the south of the East Anglia THREE site resulting in a worst case deviation of approximately 10.30nm (10.57% of route length) for vessels on passage outbound from Amsterdam. A deviation of 8.25nm (8.30% of route length) is anticipated for inbound transiting vessels passing south of the East Anglia THREE site throughout the 100% fill build scenario.
471. Throughout the partial fill build scenario of the East Anglia THREE site and East Anglia FOUR site, it is likely that vessels could transit through any defined corridor