Figure 28.5 Annual Passing Powered Allision Frequency (100% Fill – Cumulative)
486. The majority of the passing powered allision frequency is associated with structures on the periphery of the windfarms, particularly on the southern boundary of the East Anglia THREE site. This is due to the high density of traffic anticipated to pass south of the East Anglia THREE site post construction of the cumulative developments.
487. Table 28.7 presents the drifting vessel-to-structure allision risk for the cumulative developments for the worst case (ebb tide dominated) drift scenario identified.