hydrographic surveys are required at agreed intervals. These will cover the site and its immediate environs extending to 500m outside the East Anglia THREE site.
30.4 Decommissioning Plan
500. A decommissioning plan will be developed. With regards to impacts on shipping and navigation this will also include consideration of the scenario where on decommissioning and on completion of removal operations, an obstruction is left on site (attributable to the windfarm) which is considered to be a danger to navigation and which it has not proved possible to remove. Such an obstruction may require to be marked until such time as it is either removed or no longer considered a danger to navigation, the continuing cost of which would need to be met by the developer/operator.
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1