Figure 3.3 100% Fill Build Scenario Wind Turbines (172) and Substations
19. Four foundation concepts have been considered for the East Anglia THREE site. Foundation types could either be jackets, gravity base structures, suction caissons or monopiles, with the possibility of a combination of these foundation types being used across the site.
20. In accordance with industry practice, EAOW is undertaking the impact assessment based on the worst case scenario of predicted impacts, or Rochdale Envelope. For the worst case collision risk assessment, the maximum turbine foundation of 38 x 38m has been assumed (largest jacket suction bucket foundation), although the dimensions of jacket
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1 Page: 7