This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
Project: A2953 Client: East Anglia Offshore Wind Limited Title:
East Anglia THREE– Navigation Risk Assessment 13 Validation Survey 2014
131. The section presents the results of a validation survey took place between Thursday 23rd January 2014 and Sunday 2nd February 2014 from the Northern Viking survey vessel. The survey is being considered separately and as a validation to ensure that any changes to routeing since the 2012 and 2013 surveys are clearly identified including changes to the Dutch routeing measure as noted in section 12. The following section analyses traffic and was used to identify the current 90th percentile routs shown in section 14.
132. A plot of the tracks recorded during the winter (January/February 2014) validation survey, colour-coded by general vessel type categories, is presented in Figure 13.1.