Project: A2953 Client: East Anglia Offshore Wind Limited Title:
East Anglia THREE– Navigation Risk Assessment foundations would be dependent on water depths.
21. The largest topside dimensions for the HVAC substations (26 x 41m), HVDC converter stations (120 x 80m) and accommodation platforms (70 x 70m) have been used within the collision risk modelling.
22. Meteorological Masts 25 x 25m and Lidar buoys (2.8m diameter) have also been considered with the realistic worst case. It should be noted that the location of the Lidar buoys are indicative only.