Project: A2953 Client: East Anglia Offshore Wind Limited Title:
East Anglia THREE– Navigation Risk Assessment 2 Regulations and Guidance
7. The assessment methodology principally followed the DECC Risk Assessment Methodology for Assessing Marine Navigational Safety Risks of Offshore Windfarms (DECC, 2005) and the Maritime and Coastguard Agency’s (MCA) Marine Guidance Notice 371 (MGN) (MCA, 2008a). This MGN 371 highlights issues that need to be taken into consideration when assessing the impact on navigational safety from offshore renewable energy developments, proposed for United Kingdom internal waters, territorial sea or Renewable Energy Zones.
8. A checklist referencing the sections in this report which address all MCA requirements is presented in Annex 15.1.3 MGN Checklist.