This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
208. Taking into account the combined effective survey duration of 40 days, an average of approximately five vessels per day were recorded using this route, of which approximately 23% (one to two vessels per day) passed through the East Anglia THREE site.
209. The type distribution of the traffic that on this route is presented in Figure 18.2
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1