Figure 28.3 Anticipated Routeing for Route 21 - Cumulative Scenario
478. Throughout the 100% fill build scenario of the East Anglia THREE site and East Anglia FOUR site, it is likely that vessels would transit to the northwest of the East Anglia THREE site and East Anglia FOUR site resulting in a worst case deviation of approximately 0.85nm (0.98% of route length) for vessels on route 21B. This is a minor (0.8nm) increase from the East Anglia THREE site only 100% fill scenario considered in Section 18.6.
479. Throughout the partial fill build scenario of the East Anglia THREE site and East Anglia FOUR site, it is likely that vessels would transit to the northwest of the East
Date: Doc:
07.05.2014 A2539 East Anglia THREE Windfarm Appendix 15.1 Page: 191