Air Bag System: 8B-121
c. Fill plastic reservoir in deployment fixture (A) e. Attach side-air bag (inflator) module (1) in
with water or sand. This is necessary to deployment fixture using mounting
provide sufficient stabilization of fixture during attachment, sleeve lock nut and washer (2).
deployment.
NOTE:
d. Attach passenger air bag (inflator) module (1)
in deployment fixture (A) securely using M8
Make sure that deploying direction faces as
bolt (2).
shown in figure against mounting
attachment.
CAUTION:
Be sure to use M8 size and 7T strength bolt
for fixing passenger air bag (inflator) module 3
(1) to deployment fixture (A).
1
1
2
3
2
2
(A)
I4RS0A820089-
• For side curtain-air bag (inflator) module
a. Cut off bag (1) of side curtain-air bag (inflator)
(A)
module.
I4RS0A820087-
• For side-air bag (inflator) module
1
a. Remove sleeve (1) and sleeve lock nut (2), if
equipped.
2
1
I4RS0A820090-
b. Tie side curtain-air bag inflator (1) to tire (3)
with wire harness (2) as shown.
I4RS0A820088-
b. Clear space (3) on ground about 185 cm (6 ft)
Wire harness specifications
in diameter where side-air bag (inflator)
Stripped wire harness section 1.25 mm
2
module for deployment. Paved, outdoor
(0.0019 in.
2
) or more (Stripped wire harness
location where there is no activity is preferred.
diameter 1.25 mm (0.05 in.) or more)
If outdoor location is not available, space on
CAUTION:
shop floor where there is no activity and
provide sufficient ventilation. Ensure no loose
Make sure that wire harness is tight. It is very
or flammable objects are within deployment
dangerous if looseness in wire harness
area.
results in side curtain-air bag inflator flying
c. Place deployment fixture (A) on ground.
off due to shock from inflator deploying.