EQUIPMENT & ACCESSORIES CATALOG EDITION IV CRITICAL POINT DRYERS
zzzE3100 Critical Point Dryer (continued) OPTIONS AND ACCESSORIES
Glass microscope coverslip holder (option):
Specially adapted boats allow glass coverslips to be held firmly during drying. The E3000-02 is designed for the E3000 and has a maximum capacity
of seven coverslips. Likewise, the larger E3100-02 coverslip boat is available for the E3100 ‘Jumbo’ Critical Point Dryer and has a carrying capacity of 21 coverslips.
TEM grid holder (option):
The E3000-1 holder for 3.05mm grids and the E3000-2 grid holder for 2.3mm grids can be used with all Electron Microscopy Sciences critical point dryers. Maximum number of grids is three.
Porous pots with lids (option):
E800A solvent-resistant porous pots (12.7mm x 15.5mm) with lids are ideal for very small or very delicate specimens.
Service Kits:
Service kits are available; see the ordering table below. Please call our service department for specific questions.
E3100-01 is included as standard):
z E3100-1 Specimen holder for 3.05mm grids
z E3100-2 Specimen holder for 2.3mm grids
z E3100-01 Specimen holder for tissue (boat)
z E3100-02 Specimen holder for coverslips
z E800A Porous pots with lids 12.7mm x 15.5mm (pack of 10) for micro-specimens
z E4860 Recirculating Heater/Chiller to control heating and cooling cycle (please specify voltage)
For more information on the E860 Recirculating Heater/Chiller, see page 5.
55 Service Kit E3100-061 Porous Pots
ORDERING INFORMATION E3100
Supplied with:
Large Chamber Critical Point Dryer Chamber dimensions: 63.5mm Ø x 82mm length
E3100-01 Specimen holder for tissue (boat) 1m liquid CO2
delivery tube
O ring and L gasket set (including window and door bonded seals)
Spare bursting disc and retaining copper (Cu) washer Steel bar for tightening/untightening the door Flat wrench (for removing the window retaining ring) Comprehensive manual Pressure test certificate Service Kit for E3100
each Coverslip Holder
Site Requirements Site selection: The apparatus should be positioned in the laboratory with convenient access to:
z Hot and cold water supply (if the optional E4860 Recirculating Heater/Chiller are not used)
z Mains power supply (for E4860 only) z Fume cupboard or window, or an area of good ventilation z Space for CO2
siphon cylinder CO2 Cylinder: The E3100 requires a cylinder of liquid CO2 fitted with a
siphon tube (indicated by a vertical white stripe on the cylinder). If there is any doubt regarding the presence of a siphon tube, advice should be sought from the gas supplier.
Cylinder connection threads vary from country to country and even between manufacturers in the same country. For example, the transfer pipe supplied is fitted with ¼" British Standard Pipe (BSP) and 0.86" x 14 TPI union. These are standard threads for the UK and generally in the rest of the world, but will not fit cylinders in the USA.
TEM Grid Holder
Heating and cooling: Use a mixer to the laboratory hot and cold water outlets, terminating with a 6mm/¼" hose connection for the PVC tubing supplied. A ‘Y’ piece connected to the hot and cold water taps is also suitable.
The E3100 requires both hot and cold water during the operating cycle. Cooling facilitates filling of the work chamber with liquid CO2 required to take the liquid above its critical point.
, and heating is
Good control of the water temperature is essential for good results, hence the recommended use of the the E4860 Recirculating Heater/Chiller which gives precise control of cooling and heating.
Space requirement: A minimum bench space of approximately 230 x 230mm is required.
Kit
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76