This page contains a Flash digital edition of a book.
July, 2014


www.us-tech.com


Seeking EMS Quality and Customer Satisfaction Continued from previous page


OEM designs may not invite this ap- proach. But instead of forcing design rules on its clients, MC Assembly at- tempts to optimize the initial de- signs by means of its extensive DFx services. The use of custom thermal profiles for each PCB assembly helps ensure optimum solder flow and coverage. Raw materials are aggressively


screened at incoming inspection with the goal of detecting and removing nonconforming components. To main - tain control, part number assignments unique to each customer are given to all raw materials. The incoming material quality-


control system integrates a variety of tools to ensure that the correct raw materials are being received, includ- ing optical bar-code readers with em- bedded radio-frequency (RF) commu-


...instead of forcing design


rules on its clients, MC As- sembly attempts to opti-


mize the initial designs by means of its extensive DFx services. The use of


custom thermal profiles for each PCB assembly helps ensure optimum solder flow and coverage.


nications, configuration management (CM) tools to verify tolerances for all mechanical components, board fabri- cation core laboratories for verifying complex raw PCBs, and electrical measurement tools for incoming in- spection. In addition, extensive quality histories are maintained for every part ever purchased. Once kits are pulled from indi-


vidual stocking locations, off-line SMT setup and validations are used


Depending on the project, some hand assembly may be required.


recorded within the paperless system for analysis, reporting, and correc-


tive actions. When visual verification is not possible, powerful x-ray tools


Page 33


are available to inspect solder reflow and other circuit features. Such man- ufacturing process support is backed by considerable test capability, with test systems that can measure PCB assemblies and box builds for re- quirements established by their cus- tomers or by MC Assembly for its customers. Robust quality management


system (QMS) gear at the three plants reinforce the manufacturing process and test equipment. The QMS equipment and procedures ap- plied at each facility are focused on the specific needs of each customer and the specific markets that they serve.


All three manufacturing centers Continued on page 35


X-ray inspection is an important part of maintaining quality control


to ensure that the correct compo- nents are loaded onto the correct feeders. Scanners at the SMT base platforms are used for final verifica- tion that the right feeders are in- stalled in the correct sequences as well.


Paste Height Inspection When the manufacturing pro -


cess begins at MC Assembly, auto- mated three-dimensional (3D) paste height inspection, color in-line auto- mated optical inspection, and a pa- perless work flow system monitor in- process manufacturing activity and verify that the highest quality stan- dards will be maintained. First-pass SMT, in-circuit test (ICT), functional capacity test (FCT), and functional quality audit (FQA) testing are


See at SEMICON West, Booth 5743


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96