Suces stories
“One of the challenges for the stadium was that it was to be an all- electric site”
Stuart Murray Moffat
Wildfire’s approach was to ensure facilities would remain sustainable and adaptable to future shifts in hospitality and event catering. The team focused on delivering durable, high-performance equipment capable of handling intense usage cycles, while making seamless operations between front- and back-of-house a top priority. Moffat Group, a Christchurch-based company with a longstanding relationship with Wildfire, joined the project to provide expertise in designing and manufacturing the heavy-duty, electric foodservice equipment required for this all-electric stadium. “This sort of venue application benefited from Moffat’s
Above, from top: Venues Ĺtautahi’s Caroline Harvie-Teare; Wildfire Commercial Kitchens & Bars’ Craig Cunningham; Moffat’s Stuart Murray
46 Aliworld
capability to provide equipment suited to central production, including Convotherm®
Combis and Multipans, as well
as fryers and stove tops for the high-demand concession areas,” said Stuart Murray, group managing director of Moffat. “Working with professionals, the equipment specification was clear from the beginning, and Wildfire has experience
Excelling technology As expected with a project of this scale, challenges arose. Stadiums experience intense surges in food and beverage sales. To address this, high-capacity equipment
in other stadium venues using our equipment.” After initial discussions, a focus on “Support Local” helped set the design and specification. Moffat’s reputation for performance and support made them a natural partner. Their equipment serves a wide range of venues both locally and globally. “One of the challenges for the Christchurch Stadium was that it was to be an all-electric site,” said Murray. “Moffat has traditionally had a very strong electric product solution set, and for this application accelerated the development and supply of a new electric high- performance output fryer and supplied some 51 of these to the site — supporting the demand, production, and recovery requirements of intermission and half-time consumption.”
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100