ENERGY MANAGEMENT


construction period were confirmed by an M&V report. Annual M&V reports (Aug – July), detailing the savings, growth and change within the hospital, factored in the energy unit cost changes and finally weather adjusted to year 2002.


• An awareness programme was developed in partnership with the ESCO that facilitated a better understanding of the energy performance contract among the 12,000 employees and surrounding community. Staff reports of leaking faucets, overcooling or overheating have increased as well as energy saving suggestions. It was noted that staff began to implement these measures at home and are trying to change old habits for excessive use of energy.


• Other hospitals began to request information about similar projects in their hospitals. National Resources Canada (NRCan) with the Ontario Hospital association (OHA) organised a workshop to provide additional information about the incentive program and the use of ESCO to assist with cost-saving measures.


• Training for maintenance staff was part of the project to optimise and efficiently use the new equipment.


Operational and maintenance challenges Challenges include financial challenges such as reduced levels of investment in new facilities; Increased deferred capital in existing facilities; Reactive versus proactive maintenance (result is failure and downtime); and any available capital directed to priority of patient care. Other challenges include rising costs such


as labour, operations, and energy (high volatility); Increasing regulatory compliance; Environmental concerns; and infrastructure renewal.


An energy services contract with an ESCO had good support due to the fact that it addressed all of the above challenges. An ESCO provides a ‘self funded’ program


whereby the equipment and technology installed to modernise buildings and facilities is paid by guaranteed energy and operational savings.


Energy reductions and environmental impact The implementation of this project has a positive impact on the environment and global warming. The project saved 8,185 tons of CO2


, or the need for 25,654 trees. The


energy reduction for the three campuses is 125,739 GJ. The total area of the three campuses is 328,990 m2


, which resulted in


The Awareness Program booths held at the three TOH campuses by ESCO and TOH.


‘An awareness programme was developed in partnership with the ESCO that facilitated a better understanding of the energy performance contract among the 12,000 employees and surrounding community.’


0.382 GJ savings/m2 . The first year construction period savings


were estimated at $488,617, based on an M&V report. The impact on the environment from the recycling of the fluorescent tubes and magnetic ballasts in the lighting upgrades project is 9.8 tons glass, 123 kg aluminum, 154 kg phosphor and 1.02 kg mercury.


Equipment and labour The intent was to implement the most efficient and tested technologies at all campuses. The equipment was all procured within the Canadian and North American markets. Life cycle costing (25 year) considering energy efficiency, operating cost and maintenance requirements were the primary drivers in the selection of the equipment. The versatile age range of the buildings at the campuses was a challenge to this contract. The selection of the subcontractors relied on experience working in health care environment.


Measurement and verification method The Performance of Energy Conservation Measures (ECMs) that are proposed in this report refers to the amount of savings in


‘An ESCO provides a ‘self funded’ programme whereby the equipment and technology installed to modernise buildings and facilities is paid by guaranteed energy and operational savings.’


IFHE DIGEST 2014


utilities, which occurs from the implementation of the ECMs. Guaranteed performance of the ECM’s forms the basis of the Energy Retrofit Solution Contract. Measurement and verification of the performance of ECMs can be accomplished by more than one method. Selection of the most efficient method to be used for each measure requires consideration of multiple factors, including the type of utility affected, the magnitude of savings compared to total utility usage, the complexity of the measure itself, accuracy to which the performance must be determined, and cost. Two methods are used in general for


verifying ECMs performance – a whole building approach or a retrofit isolation approach. The Ottawa Hospital and ESCO used the whole building approach as the means for guaranteeing the savings.


Verification by approach For the purpose of verification, the following apply: • The selected Base Year is the calendar year 2002.


• METRIX Utility Accounting Software is used for the analysis.


• TOH to provide ESCO with photocopies of all Utility Bills starting January 2003.


• Base load growth to be studied and adjusted for if applicable by base line adjustments (BLA).


• Energy savings = Pre-project Energy use – Post-project Energy use +/- BLA • Ottawa’s Airport weather data


65


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100