ENERGY MANAGEMENT


Experiences of working with an ESCO


This article looks at the experiences and achievements of The Ottawa Hospital working with an Energy Service Company to realise energy reduction targets in a volatile continuously escalating energy market. It also evaluates the project’s positive impact on the environment, both the external environment through energy consumption reductions and enhancements to the interior working conditions.


The Ottawa Hospital (TOH) began looking at reducing its energy consumption from 1991 when a heat recovery heat exchanger was installed for boiler plant flue gases at the civic campus – sized to recover 12 mmBH thermal energy. In 1996 an audit of the civic campus lighting and steam traps was completed. Most of the recommendations were implemented, which resulted in significant gas savings. In 1998, three hospitals – the Civic, General and Riverside – were amalgamated under the new name ‘The Ottawa Hospital’ with total area of approx. 3M ft2


.


In 2001 an energy manager was hired whose primary role was to review utilities billing, establish a plan for energy savings and to prepare for the deregulation of the Ontario electricity market. An energy savings goal of approximately $2.5 million annually was established to upgrade the infrastructure. A request for proposal (RFP) was posted to secure an Energy Service Company (ESCO) partnership. The successful ESCO implemented $17 m worth of upgrades to lighting, HVAC controls, building envelope improvements and water saving measures. This resulted in the goal of $2.5 m being exceeded and was fully guaranteed. The final contract included a Measurement and Verification (M&V) component between the parties that would confirm the savings based on the whole building approach. TOH enjoyed annual savings at approx. 16M kWh, 1.7M m3 gas, 180K m3


water and


4K GJ steam. TOH received a total of $625,000 incentives from Hydro Ottawa/Enbridge Consumers Gas and NRCan (Natural Resources Canada) for the ESCO


64 Total TOH energy savings ($)


$3,000,000 $2,500,000 $2,000,000 $1,500,000


$1,000,000 $500,000 $0


Brock Marshall – P.Eng, Director Engineering & Operations, The Ottawa Hospital Faris Rashid – P.Eng, CEM Energy Manager, Engineering & Operations, The Ottawa Hospital


Figure 1: Energy savings breakdown for each utility.


project. Subsequent to the success of the project TOH continued to implement numerous other upgrades to save energy, improve performance and reinvest in the infrastructure; chiller and boiler replacements, lighting upgrades using emerging technologies and HVAC strategies to name a few. Government and utility incentives received for projects beyond 2005 has exceeded $500,000. The project used the 2002 energy use


profile as a baseline to measure and verify the proposed $2,512,428 annual savings against. The project took two years to finish. The M&V process for year one (5 Aug to 6 July) confirmed that the achieved savings were at 96.06% of the guaranteed savings ($2,413,438) as shown in Figure 1.


Brock Marshall


Brock Marshall, P. Eng, is the Director of Engineering and Operations for the Ottawa Hospital (TOH). Having spent 18 years with TOH and the former Ottawa Civic Hospital, he has progressed through the ranks of facilities management. After six years as a Project Manager in the development division, he moved forward into the maintenance department as a mechanical systems manager.


The positive impact of the project can be summarised as follows: • The TOH project has reduced the impact of the hospital on the environment by 8,185 tons of CO2


. The lighting upgrade


project through the recycling of fluorescent tubes and magnetic ballasts recovered 9.8 tons glass, 123 kg Aluminum, 154 kg phosphor and 1.02 kg mercury.


• The verified total energy savings to TOH was 125,739 GJ or 0.382 GJ/m2


.


• Guaranteed annual savings of $2,512,428. • Confirmation that health and safety regulations, industry standards and building code requirements were met for lighting levels and indoor air quality. • Savings of $488,617 in the first year


Faris Rashid


Faris Rashid gained P.Eng in 2003 Ontario, CEM & CMVP in 2006, and PMP in 2008. He is currently Energy Manager/Engineer at the Ottawa Hospital. He is a member of the Organization green team and has received five awards in teamwork. He has worked in research and university teaching and has published many papers in the field of HVAC, energy management, cogeneration and renewables.


IFHE DIGEST 2014


Hydro


Thermal


Water


Operational


Total


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100