This page contains a Flash digital edition of a book.
Page 20


www.us- tech.com


March, 2015 ElEctronic Mfg SErvicES Advanced Technologies Help Attain “Pinnacle” of Medical Training Excellence By Megan Jergens for Pinnacle Technology Group, Inc.


nology Group, Inc. has been serving customers in the medical training market as well as a variety of other industrial and commercial markets with the goal of providing the highest- quality state-of-the-art products pos- sible. “At Pinnacle Technology Group, we take pride in our ability to help our customers from concept to comple- tion,” explains President and Chief Executive Officer (CEO) Rick Wasser- man. He adds: “With our short lead times, turnkey procurement, surface mount, and thru-hole technologies, we provide perfect solutions for all of our customers’ manufacturing and design requirements. Together we can devel- op and produce an affordable solution to your needs.” Because of the firm’s aggressive and competitive nature, it employs nothing less than the latest, proven innovations and the highest- quality technologies on its production lines. The company goal is to be a world-class organization that engi- neers, designs, and manufactures the


I


n business for almost 20 years, and with headquarters in Michi- gan for nine years, Pinnacle Tech-


finest electronic medical training products available. Pinnacle recently completed a


7,500 square foot building expansion. Included with the expansion were


the past year, building a new facility and implementing lean/agile busi- ness systems to increase our efficien- cy and productivity. We are commit- ted in our efforts to be an industry


Pinnacle chose Juki 15 years


ago because of the technology’s func- tionality, continuity with current placement equipment, and cost of op- eration as well as the return on in- vestment and total acquisition cost and terms and confidence in the sales and technical support. Wasserman confirms that those


reasons remain true today, which is why Pinnacle continues to purchase new equipment from Juki. In addition to the high-quality


Juki’s FX-3R and KE-3020V high-speed flexible mounters


help improve Pinnacle’s efficiency, ease of use, cost-effectiveness, and ability to expand in the future.


the additions of two new wavesolder machines, a stencil washer, and a touch-free SMT line. Additional staff members were also hired. Wasser- man notes: “We have been busy over


The material matters in material handling


leader.” Wasserman feels that the combination of excellent facilities, processes, and people will enable Pinnacle to be a first choice for a business partner.


Continuous Technology Improvement


The company has focused on


technology and has made an effort to continuously improve its technology resources. The expanded facili- ty has instituted a paperless manufacturing environment from administration through invoicing. In addition,


its  


Exceeds ANSI/ESD standards for ESD protection Working range of –60° to 250° F Permanent ESD properties over life of product High load-bearing capacity


Reinforced composites bring a whole new level of performance to electronics assembly. And the leading name in FRP is MFG. Call us toll-free at (800) 458-6050.


Learn more about Fibrestat at www.mfgtray.com.


 


 


state-of-the-art custom manu- facturing facility is optimized for electronics manufacturing. In keeping with its strategy of working with innovative, ad- vanced partners, Pinnacle added two high-speed moun- ters, a screen printer, and a soldering robot to the expand- ed facility. In support of its produc-


tion lines, Pinnacle has worked with Juki Automation Systems (Morrisville, NC, www.jukiamer icas.com)


for


more than 15 years. Pinnacle started with Juki’s 730 and 760 placement systems, and both systems are still running and producing product after 15 years.


Three years ago, the EMS


Pinnacle Technology CEO Rick Wasserman believes the UNIX-415R


point-to-point solder robot is a best fit for the company.


provider purchased Juki KE-1070 and KE-1080 placement systems, and recently installed high-speed model FX3 and KE3020 mounters. Wasserman notes that Pinnacle also just acquired a Juki K3-R screen printer, and that the Juki equipment produces all of its SMT products: “The Juki equipment continues to keep Pinnacle competitive with state-of-the-art technology and man- ufacturing capabilities.”


With the help of Juki and its


systems, the EMS provider hopes to become as efficient and quality-driv- en as possible. The FX-3R high-speed modular mounter is part of the com- pany’s “3E EVOLUTION” concept, providing users with ease of use, effi- ciency, cost-effectiveness, increased expandability, and compatibility. By using new, highly efficient linear ser- vomotors, lightening and stiffening the head unit, and reviewing the


Continued on next page


equipment, Wasserman notes that Juki provides strong customer serv- ice: “The Juki relationship has been very good over a number of years. The technical service is always prompt and highly professional as well as the local sales representation. Our most recent purchases involved the negotiation, help, support and as- sistance from the regional as well as national executives.” Pinnacle also added a new sol-


der robot, choosing Japan UNIX (www.japanunix.com) as a partner for this technology. The company re- cently finished installing and train- ing the UNIX-415R, a soldering robot designed specifically to meet its re- quirements. The machine has per- formed as expected, but Wasserman is looking forward to seeing what the robot can do for Pinnacle in terms of speed, quality, and cost.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104