STRATEGY
STRATEGIC INITIATIVE
Project metrics tracking Enhanced project planning
Identify, analyze and strengthen critical management processes, resources and assignment of responsibilities for successful capital project delivery.
Responsible, accountable, consulted and informed matrices (for large and in-house projects)
Project Management Information System
Unplanned disruptions minimized
Analysis of FY 2019 Results
In FY 2019, the agency developed and began piloting a Project Management Information System (PMIS) to prepare for its full-scale implementation across its capital project portfolio in FY 2021. The AOC analyzed practices that led to unplanned disruptions and began refining capital planning and construction processes, including refining key project planning and management processes and defining associated roles and responsibilities of key stakeholders across the agency in those processes. The AOC also finalized standard definitions for tracking the on time, on budget and safety elements of its project tracking metrics.
Strategic Objective 2.0: Preserve, maintain and operate facilities and cultural and natural resources at the highest quality levels
The AOC will research, analyze and select the most appropriate industry standards and develop associated implementation plans for achieving desired levels of performance for each of the AOC’s key operational functions: facility management, gardens and grounds, cultural preservation, safety and compliance, sustainability and security/resilience. One strategy and five strategic initiatives support this strategic objective.
STRATEGY
Research, analyze and select the most appropriate industry standards, desired levels of performance, and associated implementation plans for achieving desired levels of performance for each of the AOC's key operational functions.
STRATEGIC INITIATIVE
Integrated Safety Management System
Facilities management/ emergency power standards
Gardens/grounds standards
Construction project security/ resilience standards
Analysis of FY 2019 Results
In FY 2019, the AOC reported progress toward this strategic objective using five KPIs. In addition, the AOC made efforts to address the strategic initiatives that support this strategic objective by beginning implementation of standards for emergency power, gardens and grounds, and security and resilience for construction projects and initiating efforts to develop an Integrated Safety Management System (ISMS) based on ISO 45001 Occupational Health and Safety to drive the continued improvement of the safety culture.
Energy and Sustainability Targets (AIF KPI 1)
This annual KPI measures the success of the AOC’s energy and sustainability program through five components: reduce energy intensity use, reduce potable water use, divert building occupancy waste, compost nonconstruction waste and divert construction and demolition debris. Each component has its own target and the KPI requires the AOC to meet the targets for
all five components.
Reduce Energy Intensity Use: This component measures the AOC’s cumulative reduction of energy use. The target calls for a reduction of 2.0 percent annu ally from the prior year goal (i.e., a 38.0 percent target for FY 2019). The AOC met its energy reduction target for FY 2019, achieving a cumulative reduction of 47.8 percent. Fiscal Year 2019 was the first full year of operation for the cogeneration plant and this was the primary source of the agency’s energy savings. In addition, completed energy savings performance contracts (ESPCs) in the U.S. Capitol Building and the House and Senate office buildings continue to provide energy and water savings. Further savings resulted from retro-com- missioning of existing mechanical systems and improvements to building system mon itoring. Implementation of large-scale campus infrastructure projects such as the Cannon Renewal Project and a new ESPC at the Library Buildings and Grounds will help the agency continue to meet its future targets.
Reduce Potable Water Use: This component measures the AOC’s cumulative reduction of potable water usage. The target calls for a 2.0 percent reduction from the prior year (i.e., a 24.0 percent target for FY 2019). The AOC met the target in FY 2019 with a reduction of 26.7 percent. The AOC focused on water consumption and continued to reconcile water usage, malfunctioning meters and billing. The agency also awarded a potable water survey to help reduce costs, improve efficiency and quantify savings.
Divert Building Occupant Waste: This component measures the amount of building occupant waste (e.g., paper, bottles, cans, printer cartridges and decommissioned computer equipment) the AOC diverted from landfills for recycling. The AOC’s target
60
Section II • Performance Information
ARCHITECT OF THE CAPITOL
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198