awarded the pre-construction and demolition services contracts. The Exhibition Hall redesign is a high-visibility project for the AOC. A more educational and interactive environment will better inform, involve and inspire visitors about Congress’ role in the democratic process. Exhibition Hall will reopen in 2021. During the renovation period, the CVC continues to offer a full calendar of tours and programs.
Incorporate New Technologies for Project Management: The AOC conducted pilot programs for new technologies such as the e-Builder project management information system to track and manage agency construction projects across the Capitol campus, and Bluebeam, for building information modeling. In addition, the agency provided user training on the e-Builder system to more than 50 AOC staff and contractors who plan and implement capital projects.
Capital Project Security Standards: The AOC coordinated with the U.S. Capitol Police to establish baseline security standards for construction projects that ensure the safety and security of the congressional community. These standards strengthen coordination and relationships with internal and external stakeholders, standardize design approaches and improve awareness of security requirements for critical construction projects.
Cultural Preservation
Ulysses S. Grant Memorial Restoration: Following the restoration of the bronze statuary and upper plazas, the AOC embarked on the next phases of the Grant Memorial restoration. Work on the lower plaza granite paving repairs began and was 80 percent complete at the close of FY 2019. Current year work included poultice work at the marble base of the Ulysses S. Grant and lion statues, stone consolidation and the installation of replica lamps. In addition, the AOC initiated a regular maintenance program to inspect the bronze castings and coatings. Going forward, the AOC will maintain the Grant Memorial on a three-year schedule.
U.S. Capitol Crypt Exhibit on Stone Preservation: The AOC installed a new exhibit on stone preservation in the U.S. Capitol Crypt. The exhibition features an overview of the stone used in buildings on the Capitol campus, causes of stone deterioration and preservation techniques, and highlights of Capitol campus stone preservation projects. Artifacts displayed include pieces of deteriorated marble, examples of replacement pieces and the tools used by marble carvers.
Facilities Maintenance
Preservation Documentation: In January 2019, the AOC completed the building preservation guide for the James Madison Memorial Building. This was the 10th building
18 Section I • Management’s Discussion and Analysis
preservation guide completed since the AOC Preservation Policy and Standards documentation program was implemented in 2010. The preservation guide classifies all building preservation zones, identifies the architecturally significant features and elements within many of the important public and private rooms, and provides the AOC with appropriate preservation treatment standards for the important elements and features of the building.
Exterior Metals Inventory and Conservation Analysis: The AOC conducted Phase 1 of an exterior metals inventory and conservation analysis. All historically and architecturally significant metals at the Capitol Building, Capitol Square, Senate Park and Union Square were identified, inventoried and located on an AOC geographic information system (GIS) planning map. As part of this analysis, the AOC surveyed each metal object, assessed its condition and prioritized its maintenance. The appropriate treatment to clean, repair and restore exterior metal was included in the report. Phase 2 inventory is underway at the Library Buildings and Grounds, House Office Buildings and Senate Office Buildings jurisdictions.
Facility Condition Assessments and Studies: The AOC completed facility condition assessments (FCAs) for the Ford House Office Building, O’Neill House Office Building, Hart Senate Office Building, Packard Campus, Robert A. Taft Memorial and Carillon, Special Facility Center and Senate Employees’ Child Care Center. The FCAs contain snapshots of current conditions and recommendations for intermediate and long-term actions. In addition, the AOC conducted studies to assess campus issues, including: a Hart Senate Office Building garage operational study, Hart Building air handling unit study and a groundwater penetration study for the tunnel connecting the Cannon Building to the U.S. Capitol.
Gardens and Grounds Standards: The AOC convened a cross- jurisdictional committee to develop standards for Capitol campus’ gardens and grounds. The standards will enhance and refine existing landscape plans such as the Snow Removal Operational Plan, the Arboretum Management Plan and landscape and tree protection standards.
Facilities Operations (including Sustainability and Energy)
Cogeneration System Operations: Following a three-year construction effort, the AOC completed its first full fiscal year of cogeneration operations in FY 2019. The implementation of the cogeneration system at the Capitol Power Plant helps the AOC promote the reliable and efficient delivery of utilities on the Capitol campus. This new plant generates electricity and steam, improves plant efficiencies and provides significant energy savings.
ARCHITECT OF THE CAPITOL
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198