search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
September, 2017


www.us-tech.com


Morrisville, NC — Juki Automation Systems (JAS) has introduced sever- al new products, including the brand- new ISM UltraFlex 1800 component storage system, AXI5100c in-line X- ray component counter and the RS-1 placement machine. The UltraFlex 1800 is able to


dynamically adjust the internal sub- division of space to accommodate changing mixes of reel heights from 8 to 88 mm (0.3 to 3.5 in.), and diame- ters from 7 to 15 in. (17.8 to 38 cm). The new case designs allow storage of JEDEC trays in any case format. The ISM UltraFlex 1800 is


designed to offer flexibility, large storage capacity and the intelligence to communicate with a wide variety of vendor platforms. Capable of pro- viding up to 54 reels for production simultaneously, the storage system


PDR Intros IR Thermal Test System


Shingle Springs, CA — PDR Americas has introduced a new ther- mal test system, the IR-TS One. The


can read low parts, and signal to out- put the required reel in advance. The AXI500c X-ray component


counter can count the latest 03015s as well as four 7 in. (17.8 cm) reels or one 15 in. (38 cm) reel of various thicknesses. In addition to counting reels, the AXI5100c can count compo- nents in ESD bags, storage sticks and trays. The component counter is a fully-automated, in-line system that loads and unloads components by using various conveyors, loaders and unloaders, and even robots. A key advantage of the in-line counter is the ability to communicate directly with the company’s ISM component storage towers. The mid-speed RS-1 placement


Page 77 Juki Intros Dynamic Component Storage System


machine contains one multi-function LNC-120 head, which has a 12 mm (0.5 in.) pitch and eight nozzles, as well as a diffuser for vision. The head’s laser moves up and down depending on component height, resulting in high cph regardless of the height. Combined with RF elec- tronic feeders, the system has an optimal throughput of 40,000 cph. With new odd-form recognition tech- nology, the RS-1 provides easy data


entry for odd-form parts. Contact: Juki Automation


ISM UltraFlex 1800 component storage system.


Systems, 507 Airport Boulevard, Morrisville, NC 27560 % 919-460- 0111 E-mail: gryden@jas-smt.com Web: www.jukiamericas.com


See at SMTAI, Booth 1131


IR-TS One thermal test system.


company is also highlighting its IR- E3M rework platform. The rework platform has been enhanced for extreme micro-rework applications. In addition to general-purpose appli- cations, the IR-E3M’s thermal, mechanical and optical features are engineered to handle micro-compo- nents and micro-PCBs. Using PDR’s non-destructive,


dual-thermal stress screening process, based on a variation of HALT/HASS principles, the IR-TS One is able to focus testing on sus- pected problem areas. This safely screens out early field failures caused by design, environmental, production, and structural defects. The IR-TS One uses the company’s dual-zone IR heating and gas cooling process that heats the PCB and com- ponent independently in a safe ther- mal cycle and can be used during live system/function HALT/HASS test- ing. The TS One works alongside HALT/HASS/environmental test chambers, with the convenience of a benchtop system. Applications include: compo-


nent characterization, bare die test- ing, component and PCB assembly design validation testing, solder joint validation, and polymer bond testing. The system is designed for use in industries, such as automotive, aero- space, defense, medical, and con-


sumer electronics. Contact: PDR Americas, 3869


Dividend Drive, Shingle Springs, CA 95682 % 530-676-6262 E-mail: sales@pdrxy.com Web: www.pdr- rework.com See at SMTAI, Booth 233


See at SMTAI, Booth 123


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124