Page 50
www.us-
tech.com
October, 2019
CAMI: Versatile Test and Cable Management System
Acton, MA — CAMI’s CableEye cable and harness test systems offer a vari- ety of features, including multi-lan- guage support, dynamic and graphic- rich displays, real-time screening for
Taking full advantage of the
PC’s graphic display, high-speed computation and mass storage, Ca- bleEye test systems are designed for versatility. Expandable and pro-
sign, assembly, prototyping, produc- tion, and QC to measure, display, and document a matrix of parame- ters and components (e.g. continuity, resistance, capacitance, inline com- ponents), including single-channel safety testing on chassis, panels and transformers. There are also plenty of options to customize and automate the tester to control tower lights, LEDs, audible tones, foot pedal, re- mote control, lock and release latch- es, diverter gates, reports, labels, and more. Program automatic test proce-
dures with macros or JavaScript, and use external relay boards to auto- matically switch different circuits in
the UUT during test. ID badges can be scanned for
operator log-in, and work orders for automatic tester set up. Optional API software, which includes a Lab- VIEW interface, enables integration with other equipment. All systems ship with the same
comprehensive software providing test functions, connectors database, graphic wiring display, documenta- tion, data logging, automation-script- ing and many more features. Contact: CAMI Research, Inc.,
42 Nagog Park, Suite 115, Acton, MA 01720 % 978-266-2655 E-mail:
info@camiresearch.com Web:
www.camiresearch.com
Choosing a Parylene Coating Provider
Continued from previous page
intermittent connections, relay con- trol, cable length measurement, sim- ple automation scripting, light-guid- ed assembly, barcode tracking and data logging, wire twist determina- tion, and precision resistance meas- urement (4-wire Kelvin).
CableEye production screen. grammable,
these future-ready
testers provide pass/fail check and diagnostic solutions for countless ap- plications in transportation, energy, medical devices, defense, R&D, and more.
CableEye may be used for de-
almost always the final step in the process. Selecting a Parylene provi - der that offers an attractive standard turn time as well as expedited op- tions allows for more flexibility and forgiveness when deadlines are a problem. The industry standard for Pary-
lene is roughly 14 days. Para-Coat Technologies offers a standard seven- day turn with expedited options of three to four days.
Experience. Parylene coating can be
a very challenging and time-consum- ing process. Having a staff that is well trained and experienced is vital to achieve the quality you are looking for in a timely manner. A highly skilled workforce with solid manage- ment and low turnover is a key com- ponent to finding the right Parylene coating provider. Contact: Para-Coat
Technologies, Inc., 17 Johns Street, Johnstown, PA 15901 % 814-254-4376 fax: 814-254-4057 E-mail:
info@pctconformalcoating.com Web:
www.pctcc.com r
See at productronica, Hall A2 Booth 135
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112