This page contains a Flash digital edition of a book.
052 REPORT


EUROVISION SONG CONTEST


Company: MA Lighting Location: Düsseldorf, Germany


Photo © Ralph@Larmann.com


The 56th Eurovision Song Contest was held at Düsseldorf Arena, marking the show’s first return to Germany since 1983. This year broke records in many areas including equipment load and audience size. The show spanned three live broad- casts - two semi-finals on 10 and 12 May and the finals on 14 May. The 2011 finals in Düsseldorf had one of the largest live viewing audience in Eurovision history with 36,000. This combined with an estimated 120 million television and internet view- ers makes it the largest music television program in the world. German Lighting Designer, Jerry Appelt, known for delivering big looks for music, television and everything in between specified a magnificent arsenal of lighting for the massive Arena in Düsseldorf. More than 2,100 DMX controlled moving lights (5,638 fixtures total) with almost 42,000 parameters allowed 43 countries plus three interval acts and an over-the-top opening performance to have a completely unique look during the three hour broadcast. Control for all lighting and video came from MA Lighting. Four grandMA2 full-size consoles, each with a full backup, as well as five grandMA2 faderwings ran all light- ing and video, triggered via timecode. A total of 11 MA NPU (Network Process- ing Unit) devices handled all traffic in one session on the MA-Net2. “It’s not even practical to do a show like this without timecode and grandMA2 is the best,” said Appelt. “Absolutely every millisecond is cued and then rehearsed again and again and again. There is no room for an error in a show of this size. The MA system delivered a great result.” Four operators ran the desks: one for video, one for effect light, one for white light, and one for audience and Green Room. Preprogramming began in Hamburg at NDR from 21 March to 8 April 2011 using the cost free grandMA 3D running on four custom built Cape Cross PCs. The team built moving paths for all moving trusses in grandMA 3D to show the exact positions of the lights in each song. In total there were 70 patched universes and 2,921 cues. Approximately 8.5km of truss were required to suspend the 280 tons of equipment for the show. The truss structure, approximately 20 metres directly above the stage, consisted of three rings of 10 metres, 16 metres and 30 metres diameter, with a fourth ring over the satellite stage used for hosts and some of the performances. The main stage centre rings held Clay Paky Alpha Series fixtures - a mixture of Alpha Wash 1500, Alpha Beam 1500 and Alpha Profile 1500 fixtures, creating a variety of bright effects to the stage below. Moving truss sections were arranged like spokes from the ring trusses. The truss sections held an additional 28 Alpha Wash 1500 and 36 Alpha Beam 1500 with four shorter truss sections holding 24 Alpha Wash 1500 fixtures. Additional truss stretching the ceiling to the perimeter of the arena held 35 Alpha Profile 1500 and 42 Alpha Spot HPE 1500 fixtures. Finally, the top perimeter of the arena was home to an additional 50 Alpha Spot HPE 1500 fixtures. To match the intensity from above, Appelt placed 24 Alpha Beam 1500 and 24 A&O Falcon Xenon 3K flowers on the floor behind the stage and along the sides for a full range


www.mondodr.com


of effects. Appelt also specified 24 Clay Paky Sharpy fixtures for the floor sur- rounding the front of the stage specifically for Lena’s performance for Germany. Followspots had full coverage as well with six Robert Juliat Aramis 2.5kW HMI DMX main spots on the platform, five Robert Juliat Victor 1.8kW HMI as back followspots on truss seats and four Robert Juliat Lancelot 4kW HMI followspots on the balcony. Lighting was supported with 48 ETC 750W Source Four 10° fixtures. Cape Cross of Cologne, Germany provided all lighting and rigging for the show, sending 130 trailer trucks, each with 40 tonnes of equipment. Thomas Brügge, Managing Director of Cape Cross said: “grandMA2 is a very popular brand for us. The grandMA2 is a smart console and it’s great that we can totally rely on MA Lighting.” All video content was operated off eight MA VPU plus (video processing unit) each with full backup. A Barco Encore system was responsible for routing the signals from the OB truck to the LED wall. Video equipment and servers were supplied by Creative Technology. All media equipment was housed next to FOH and operated by Michael Giegerich off a grandMA2 and managed by Stephan Flören (media server technician). The graphics were created by the screen design team from Gravity, Julien Rigal, Falk Rosental and Thomas Neese. Video content was displayed on a 67-metre wide by 18-metre tall CT Spider 30 N5 LED screen forming the back wall of the stage. A total of 2,100 Barco MiSTRIP 1480mm and 165 MiSTRIP 375mm plus 2,480 Barco MiTRIX tiles were used for visual detailing around the stage and the movable rings overhead. R20 projectors were used for the audience screens. Even the satellite stage and Green Room got special treatment with 400 metres of Schnick Schnack Systems strips built into surfaces. Concert and Stage Producer Ola Melzig consulted with the delegations and artists regarding the details of each performance including lighting, video, pyro, sound and camera angles. “Video is one of the trickier elements as sometimes our team doesn’t get specific instructions on how each country wants their look. After the first round of rehearsals there are usually several requests for changes - even Spain completely changed their content the day of the final broadcast. Luckily, we had a very talented crew and some of the best equipment available. In the end, everyone walked away completely satisfied.” The company behind the creative production of Eurovision 2011 was - by order of host broadcaster NDR - Brainpool TV GmbH. Led by Producer Show Jörg Grabosch, Brainpool managed all creative aspects including staging, lighting, pyro, hosts, viewing room and technical crew. and managed the companies in charge of these areas: Cape Cross (lighting & rigging), Creative Technology (video), Stage Kinetic (moving LED screen), MCI (set construction) and LunatX (pyro) who also worked with a grandMA2. www.malighting.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140