38 STRUCTURES Metsec in the frame for urban school


A COMPREHENSIVE SCHOOL IN STREATHAM, SOUTH EAST LONDON, HAS GAINED A UNIQUE NEW SPORTS HALL THANKS TO A COMBINATION OF METSEC’S LIGHTWEIGHT STEEL FRAMES AND BEAMS AND AN INNOVATIVE BUILDING DESIGN FROM URBAN SPACE MANAGEMENT (USM).


U


SM, the main contractor on the project, also provided the design for Dunraven School, which uses modified shipping containers as mega- building blocks linked by Metsec’s steel framing to create an innovative wall structure. Metsec lattice trusses have been used to support the roof on Metsec Z purlins.


Specialist contractor Chartway Ltd, ordered three 18 metre mono pitch lattice trusses from Metsec to span the space between the stacked shipping containers, which form three sides of the building’s structure; and a pre- engineered Metsec frame, to create the sports hall’s glazed end wall, which was constructed on site. The glazed wall comprises 342mm deep rails sections, used as vertical mullions, and 142mm deep rails used as crosspieces. Constructing the building in this way allowed Chartway to complete the frame in just three weeks. Chartway’s David Brough comments, “Metsec was already specified for the project, but we would have chosen them anyway because of our trust in them to deliver products and support exactly when we need it.”


Metsec Divisional Managing Director, Roy Burns, says, “We’re delighted to have been chosen for this project. The building uses products from three of our divisons - Framing, Lattice Beams, and Purlin, demonstrating the advantages of a one- stop-shop when it comes to design, supply and logistics. Our manufacturing capability ensures the fast and accurate supply of materials to site, enabling our customers to meet the tightest building programmes.”


Metsec’s lattice beams and trusses are ideal for structures such as sports halls, which need a large area without support pillars, as they can span up to 40m. Lightweight and easy to handle on site, the open lattice allows for easy, flexible passage of services. The lattice also uses up to 50% less steel than traditional hot rolled beams, which means that fluctuations in raw material prices have less impact on the total build cost.


Metsec’s purlin range was re-launched in June 2008 with more efficient profiles. Made from cold rolled galvanised steel, they have a minimum yield strength of 450 N/mm² giving maximum performance for minimum weight. The range includes fully compatible Z- and C-section profiles in depths ranging from 142 mm to 342 mm.


Metsec is the market leader in providing light gauge, galvanised steel structural framing systems suitable for a wide range of applications in construction. Its two main product groups are Metframe and SFS (Steel Frame System). Metframe is a pre-panelised framing system, fabricated off-site and assembled on site with metal deck/concrete floors supported on C-section steel joists providing a complete superstructure. SFS is a fast track steel stud and track frame which is fixed as infill between the main structural frame members and provides a carrier for insulation, exterior cladding and interior wallboard. While Metframe is pre-engineered off-site, in line with


the demands of Modern Methods of Construction, SFS is stick built on site to allow for greater flexibility. Both systems are structurally proven and independently tested to provide thermal, acoustic and fire resistance. Sections are bar-coded to facilitate easy construction on site.


Metsec is the UK’s largest cold roll-forming company, providing engineered solutions and structural steel components to the UK’s construction and manufacturing industries. The company was a pioneer in cold-roll forming when it set up in 1931 and has unrivalled expertise in product design and manufacture. It is committed to both excellence in manufacturing and protecting the environment. It has achieved BS EN ISO 14001:2004 accreditation for environmental performance as well as the prestigious gold standard under the Steel Construction Sustainability Charter.


Metsec Click here to request literature


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100