COMPANY NEWS


Preventing signalling power failures


The UK rail industry is experiencing unprecedented growth, with twice as many passengers and a doubling of freight expected by 2035. The need to maintain a reliable service is paramount, and signalling power failures can be one of the primary causes of train delays, says Paul Fleming, general manager, Camlin Rail.


T


he 650V legacy power network was first built in the 1950s. A typical signalling power feeder consists of a single fused supply point, up to 10km of power cable and multiple location cases distributed trackside. In the event of a cable fault or theft, the fuse will rupture and the signals will turn black, causing trains to stop and delay minutes to start. During this time a maintainer will be called to site to locate the fault, repair the cable and restore supply, which can take up to five hours.


While the severity of the delay may be minimal on rural routes, on major routes such as the West Coast Main Line (WCML) the delay costs can easily run into hundreds of thousands of pounds with a direct impact on route reliability and customer satisfaction.


configuration.


Designed, developed and implemented by Camlin Rail nearly ten years ago and installed strategically on the WCML, Signet is available as a Class I or Class II product and is suitable for 400V or 650V signalling power feeders. Signet is applicable to double or single end fed feeders but double end fed is more common. A double end feeder is powered from both ends via a PSP (Principal Supply Point) with an open point in the middle to prevent joining two independent power supplies together. FSPs (Functional Supply points) are installed trackside and they distribute the power to the signals and points. The feeder is completely intelligent, as each


Improving reliability and availability


Signet solves the problem of signalling power failures by automatically re-configuring the network in the event of a fault, such as cable theft, to maintain supply, with no effect to train services and no delays.


Camlin Rail is the only Network Rail approved supplier of automatic reconfiguration for signalling power – Signet.


Signet is a ‘smart grid’ that is designed to maintain the supply of power. In the event of a fault, or even when a section of the power cable is stolen, the Signet switches first open in order to protect the power system and then re-configure the network in order to isolate the faulted or missing section and provide continuity of supply. Once the fault has been repaired or the missing cable replaced, Signet will restore the network back into its original


16 | rail technology magazine Apr/May 13


Camlin Rail – the new name for Kelvatek in the UK rail industry


Camlin Rail, part of the Camlin Group, supplies a range of innovative products to the global rail industry. The Camlin Group, with its subsidiaries Kelvatek, Camlin Rail and Camlin Power, is a privately owned holding company with a distinguished 30-year history within the global utility and rail sectors. Camlin headquarters are based in Lisburn, Northern Ireland, with engineering and customer support facilities located around the world.


Due to the continued growth of its UK rail business, Camlin has formed a dedicated subsidiary, Camlin Rail, in order to ensure continued innovation and support for the UK rail sector. The railway team remains unchanged under Paul Fleming and we look forward to meeting all our customers at Railtex on stand E111.


FSP contains a Signet to dynamically control the flow of power throughout the feeder.


Signet is the last line of defence on signalling power feeders so it is absolutely critical that it operates first time every time in order to maintain signalling supply. In order to achieve such high levels of performance, Signet underwent several months of rigorous testing and scrutiny by leading Network Rail power and software engineers.


Protecting the WCML


Cable theft is a national issue, unpredictable in nature, and causes widespread disruption on key routes. Signet has proved to be an invaluable tool in countering the problems caused by cable theft by automatically isolating the missing section of cable and re-configuring the power to maintain supply to the signals with no effect on train movements and no delays. Following a fault condition, Signet provides intelligence to asset management through automatic alerts including feeder location and the identification of the faulted section.


Over 550 Signet units are currently installed and operating on the WCML, the busiest route in the UK connecting London to Glasgow, carrying over 30m passengers annually. Signet is responsible for ensuring power is continually delivered to the signalling systems and, over the last ten years, has performed thousands of successful operations, saving time and money for the route operator while improving the reliability and quality of train services.


www.camlinrail.com FOR MORE INFORMATION


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204  |  Page 205  |  Page 206  |  Page 207  |  Page 208  |  Page 209  |  Page 210  |  Page 211  |  Page 212  |  Page 213  |  Page 214  |  Page 215  |  Page 216  |  Page 217  |  Page 218  |  Page 219  |  Page 220  |  Page 221  |  Page 222  |  Page 223  |  Page 224  |  Page 225  |  Page 226  |  Page 227  |  Page 228  |  Page 229  |  Page 230  |  Page 231  |  Page 232  |  Page 233  |  Page 234  |  Page 235  |  Page 236  |  Page 237  |  Page 238  |  Page 239  |  Page 240  |  Page 241  |  Page 242  |  Page 243  |  Page 244