Tips for Successful Product Transfers


Continued from page 16


Soltec has adopted a very simple process for this using an Excel spreadsheet versus project manage- ment software. The WBS includes the individual tasks, the estimated time to complete the task and a task owner and is reviewed on a quarterly basis for review of completion dates and revisions where required.


Determine How to Manage Proj- ect/Process. With the WBS com- plete, the Project Manager and team must determine how the team will work together to successfully com- plete the project. The frequency of meetings will depend on the timeline of the project. For projects that are to be completed in a short period of time, six month or less, weekly meet- ings may be necessary. For projects that will last more than six months, meetings every two weeks will likely be enough. Meeting topics will vary according to the specific transfer, but most should include a review of open action items, a list of work done to date, a list of work to be completed next and a risk review. The team will need to deter-


mine how to manage all project relat- ed documents and how files will be shared. Consideration should be give as to how to handle technical docu- ments and other project related doc- uments using a file sharing method, common drives or databases.


Communication Plan With all the above work com-


plete, the communication plan can be created. This is a critical step and will require much thought as to what to communicate, when and how. In most product transfers there is a sending side which often results in the loss of jobs. This is a critical point in the project and an opportunity to establish trust among your employ- ees, customers, vendors, reps and distributors.


Monitor and Measure. Once the transfer is in process, achievement of major milestones and specific tasks will need to be monitored and meas- ured. Key metrics should be identi- fied and discussed during project meetings and should include measur- able items such as the number of items that have been sourced or the number of engineering drawings that have been transferred. When transferring products


from one location to another project planning and execution become criti- cal to an organization’s future suc- cess. An organization can choose for- mal project planning methods to achieve this or can take a modified approach. Regardless of the method chosen for the right strategy for an organization, putting the right team in place, and communicating to all involved will help in achieving the desired outcome. Contact: Vitronics Soltec USA,


6 Merrill Industrial Drive, Unit 3, Hampton, NH 03842 % 603-772-7778 E-mail: info.us@vsww.com Web: www.vitronics-soltec.com r


www.us-tech.com


Page 31


Schleuniger: Processing Difficult-to-Strip Wires


Manchester, NH — The UniStrip 2550 is a fully programmable strip- ping machine, offering high precision and flexibility. It strips wires rang- ing in size from 0.03 to 6mm2(32 to 10 AWG) and jacketed cables up to 5.5mm (0.22-in.) in diameter. The machine comes standard with V blades, the optimum solution for stripping most wires without having to change blades. The UniStrip 2550 can also be


equipped with radius, die or flat blades, depending on the application. These special blade types are used for stripping wires with difficult-to- strip insulations such as Teflon, Kap- ton, Kynar, etc., typically used in the military and aerospace industries. An integrated library of stan-


dard wire sizes and an intuitive menu-guided touchscreen interface make the unit the most user-friendly


cluding focused LED lighting, provide a high level of operator comfort. The UniStrip 2550 is


Versatile wire stripper.


machine of its type on the market. All parameters are fully programma- ble and can be stored or recalled in seconds. Excellent ergonomics, in-


a perfect complement to the highly successful UniStrip 2300 stripping machine. Both machines share a common user in- terface and machine de- sign. While both ma- chines can use universal V blades, the UniStrip 2550 goes one step further in being able to use radius blades, die blades, and flat blades. Contact: Schleuniger,


87 Colin Dr., Manchester,


NH 03103 % 603-668-8117 fax: 603-668-8119 E-mail: sales@schleuniger.com Web: www.schleuniger-na.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104