search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Page 30


www.us-tech.com


September, 2021 High-Powered IR Rework from PDR


To Be Strategic


CrimpCenter 64 SP


Produce Faster, More Precisely, and More Cost Effectively


The CrimpCenter 64 SP processes wires with conductor cross sections from 0.13 to 6 mm² and features the latest quality assurance options, such as SmartDetect, WireCam and Guided Feasibility Study, to ensure transparency and traceability of important production data. These features, along with a number of performance enhancements,   production with high quality requirements.


     


Reliable, high precision technology Increased effective performance Minimized setup times


 Optimized parameter settings Enhanced deposit quality


Wire Solutions for a Connected World


SHINGLE SPRINGS, CA — The PDR IR-E3 Evolution rework system for PCBs is a high-pow- ered system, available with a multi-zone 2,250, 2,800 or 3,050W PCB pre- heater and is designed to rework components on small- to medium-size PCB assemblies with di- mensions up to 18 x 18 in. (457 x 457 mm). It is loaded with ad-


vanced features yet re- mains simple to set up and to use. The system is now available in three models — the E3S, E3G and E3M. Made in the United Kingdom with only the finest components for optimum preci- sion, the PDR IR-E3 is PDR’s best-selling system and one of the best-performing BGA rework stations available. PDR’s IR-E3 series of


SMD/BGA IR rework systems are engineered to cope with the chal- lenges of repairing today’s PCB assemblies. The systems use PDR’s patented focused IR tech-


nology, which consists of dual- band visible IR heating. The sta- tions are nozzle- and gas-free. The IR-E3 series provides


IR-E3 rework system.


extremely high levels of profiling and process control necessary for the effective rework of the most advanced packages, including SMDs, BGAs, CSPs, QFNs, LEDs, flip-chips, small compo- nents, and lead-free applications. Contact: PDR Americas,


3869 Dividend Drive, Shingle Springs, CA 95682 % 530-676-6262 E-mail: sales@pdrxy.com


Web: www.pdr-rework.com/americas


Averatek’s Mina Chemistry Adopted by NexLogic


schleuniger.com


SANTA CLARA, CA — NexLogic Technologies has implemented soldering to aluminum using Av- eratek’s Mina™ chemistry. Mina is a breakthrough new pretreat- ment that allows for soldering to aluminum as easily as to copper with significant benefits over traditional methods of soldering


to aluminum. Mina replaces silver-based


ACP with solder, offering higher reliability at lower cost. By utiliz- ing Mina, NexLogic Technologies can now harness the advantages of aluminum over copper — the


Aluminum pretreated with Mina.


same conductivity at half of the weight and a fraction of the cost. Manufacturing is also more


environmentally friendly than traditional processes, as Mina eliminates the steps required for surface finishes for aluminum and shortens processing time. There are multiple applications for Mina, including RFID mass production, LED lighting panels and power electronics. Averatek Corporation li-


censes the chemistry to select EMS companies. To utilize this unique assembly process, cus- tomers work closely with Aver- atek’s engineering team for im- plementation. Contact: Averatek Corp., 550


Nuttman Street, Santa Clara, CA 95054 % 408-496-1010 E-mail: info@averatek.com Web: www.averatekcorp.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100