Crucial Cooling Tips


Smart system design and maintenance keep induction melt operations running. SUSAN HUNTER, DIRECTOR OF DEVELOPMENT ENGINEERING, EMSCO, MASSILLON, OHIO, US


冷却系统的关键点


智能的系统设计和维护保持感应熔化作业的正常运行。 SuSan Hunter,美国俄亥俄州马西隆市,emSco公司工程开发部部长。


W


e saw how essential a cooling system is to the International Space Station in December 2013, when one coolant pump failed. Tat left only one other pump to


provide cooling for the station’s vital electrical and life- support systems. Tis required a crew member to make an emergency spacewalk to swap a spare for the pump that had failed. With its new pump in place, the station was back in the space exploration business. While it might not be rocket science, when it comes to


cooling, induction melting is as dependent on an effective cooling system as the International Space Station. Without adequate cooling, induction furnaces are not able to operate. And in the worst cases of cooling system failures, furnaces have been damaged or destroyed, endangering workers and causing significant damage to the foundry. Metalcasting cooling systems normally operate quietly


in the background and receive regular attention only from the maintenance personnel tasked with keeping them run- ning. Te goal for this article is to provide useful insights into the design and operation of effective and efficient induction melt shop cooling systems, with real-world illustrations drawn from a new system installed at Chas- six Columbus Casting Operation, Columbus, Ga., U.S. Chassix is a $1.2 billion global company headquartered in Southfield, Mich., serving automotive customers from 25 locations in eight countries. Its Columbus facility melts 240,000 tons of ductile iron per year.


013年12月,当一个冷却泵故障,我们看到了 冷却系统对国际空间站是多么重要。仅剩的另 外一个泵运转的冷却系统,保障空间站重要的 电气和生命维持。这需要宇航员进行紧急太空行走, 取备用泵更换故障泵。随着新泵的就位,空间站可继 续太空探索旅程。


2


虽然不属于火箭科学,但是涉及到冷却,感应熔炼与 国际空间站一样依赖有效的冷却系统。如果没有足够的 冷却,感应炉将无法运行。而在冷却系统故障的最坏的 情况下,感应炉被损坏或摧毁,危及工人安全并给铸造 厂带来巨大的损失。


铸造厂的冷却系统通常在后台悄悄运行,并接受维护 人员定期的检查使它们保持可靠运行。本文的目的是希 望通过美国乔治亚州哥伦布市Chassix铸造公司安装新 系统实际案例,给出设计感应熔炼车间有效和高效的运 行的冷却系统的有益的见解。Chassix公司是一家总值 约为12亿美元的全球性公司,总部位于密歇根州南菲尔 德市,给8个国家25个地区的汽车行业客户提供服务。 其位于哥伦布市的工厂年熔化球墨铸铁24万吨。


冷却系统的基本构成


Chassix’s old cooling tower and pumps lacked the capacity required to cool all the furnaces at the same time, limiting production.


Chassix公司旧的冷 却塔和泵无法同时冷 却所有炉子,制约了 生产。


September 2014 FOUNDRY-PLANET.COM | MODERN CASTING | CHINA FOUNDRY ASSOCIATION | 59


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82