search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
product news/產ռ新聞


The newly updated nine-ton induction furnace has boosted Grede’s Brewton, Ala., melting output.


Tese improvements were installed during the facility’s


scheduled shutdown in December 2014. Communica- tion between Grede-Brewton’s maintenance team, ABP’s engineers and the installation contractors led to a relatively smooth conversation, which started on time with no signifi- cant hiccups. “Te project started with equipment placement, followed


by plumbing and cabling which were done simultaneously,” Green said. “Te real action began when the service engineer started to commission the system. Te installation was first thoroughly checked, followed by a series of tests with power on. In the end, the transition was seamless.” Grede-Brewton, which produces approximately 60,000


tons of ductile iron castings annually, has already begun plan- ning to update the second nine-ton furnace in the near future. Te ability to remain competitive by increasing capacity, all while minimizing investment, has proven valuable to the cast- ing facility, no matter the age of its melting equipment. “Induction furnaces are designed to last a lifetime, if prop-


erly maintained,” Green said. “During that lifespan, technol- ogy evolves and improvements can reduce labor and mainte- nance cost and increase productivity and sustainability.” Tis article is based on work from Daniel Green and Tim Herring, ABP Induction Systems, North Brunswick, N.J. ■


ङԴ工顿鲁٢KJKX-州马巴拉阿д高提炉应感吨 新升级ङ 熔炼ਈ力。


,通沟ङई流д੧进մы工施装安Њ٤३工ङ՛Ҹ 。难֟ङ显明ӱ遇有没,ऩ项造改动կ期按并 ੧进时գե随,始开装安ङוગђ३工项这Ȕ д管道չ电缆ङ铺ગ,ȕ-XKKTપ:Ȕफӱ服务工 ث,ү首。始开۵造改ङ正ऱ,统系ડલ始开٤३ 电٫ङӧ系一д੧进եФ,查检ङ面Ҷд੧进装安 测ડ。最ե,系统升级实现д无ড়过渡。ȕ Ѕ吨球 约ф生年每Դ造铸顿鲁٢՛ҸKJKX-


吨熔炼炉ङ改造ઋ Ֆиআ动կ期近֨并,ў铸铁 加增造改过通,Ѿײچ३旧新ङוગ炼熔管Љ。Ӧ 铸йث明ચ已,力ж竞持ґ՛Ҹ҅资投صӗ并ਈф 造ѣЏ是非常有џқङ。 用҅С永љՕ是炉电应感,Ј护维ङे正֨Ȕ


ङ术技,И期յո生ङ用҅֨Ȕ:પTKKX-ȕ,ङ ф生高提并,本成护维չ工ыصӗלਈ高提չيՇ 率չՕ持续性。ȕ


Ҹ统系应感6('ङұ瑞Ѱ٢北州西泽新йׂ文本 ՛*GTOKR -XKKTչ:OS .KXXOTMङખ文。 ■


66 | FOUNDRY-PLANET.COM | MODERN CASTING | CHINA FOUNDRY ASSOCIATION March 2016


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84