SUPPORTING SOLUTIONS TO CHALLENGING


OFFSHORE WIND ISSUES The subsea centre of excellence at Blue Abyss, the world’s first commercial aquatic and space research, development and training centre, will offer the perfect arena to research and test solutions to issues challenging offshore windfarm development.


TRAINING


RESEARCH & DEVELOPMENT FACILITY


The pool also offers potential for research into reducing noise propagation from piling – including through the development of improved acoustic baffles – to answer industry predictions that permitted noise levels for offshore windfarms will have to be reduced. Celia Anderson, of Blue Abyss, is talking to the industry about how the centre of excellence can support and develop its key areas including…


• Improved cable installation monitoring, inspection and repair


• Cost-effective subsea surveys of offshore wind foundations by remote inspection using ROVs, AUVs UAVs and ASVs e.g. for scour prevention or corrosion of foundations


• Better cleaning technologies for subsea structures


Celia explained: “80% of insurance claims related to offshore windfarms are about cable failure (GCube). Operators are looking for new ways to improve the reliability of these assets through improved protection and monitoring.


“The facilities are designed to encourage engineering innovation along with safe controlled facilities to work on mitigating risk in subsea environments.”


Blue Abyss’ 50m deep pool – the world’s biggest – with its capability to simulate offshore tidal and current conditions, will provide a safe and controlled environment for innovation development, research, testing and training.


OFFSHORE WINDFARM CHALLENGES


Issues currently vexing the fast- developing offshore wind industry, include scour prevention, cable laying and protection and substructures. Alongside the pool, will be hyperbaric and hypobaric chambers, an opening roof and a 30-tonne poolside crane capable of lifting and submerging equipment, is


designed for partnership with the growing offshore industry assisting in creating some of the world’s biggest windfarms off its coast.


REMOTE SUBMERSIBLES


As the offshore industry moves to use fewer divers – eventually taking divers out of the process altogether – and with windfarms being built further out to sea in deeper water with bigger turbines, a key focus for pool activity falls on ROVs, AUV, and other submersibles. Developing the latest submersible technology is key to maximising the potential of offshore wind farms.


Blue Abyss will be ideally placed to work with universities in the East of England – the University of Cambridge, University of East Anglia and Cranfield University – on subsea projects. “Blue Abyss has a significant role in bringing people together to benefit the industry, whether it is research or local universities, or the companies themselves. We can learn from other sectors as well as sharing our experiences into developing areas such as the space industry,” Celia added.


ADDITIONAL USES


Companies will also be able to use the subsea centre of excellence for operational training, simulations and demonstrations. The facility will also offer a conference amphitheatre and training rooms, a 120-bed hotel with large central community area and on-site parking.


Blue Abyss


www.windenergynetwork.co.uk


21


SPOTLIGHT ON EAST OF ENGLAND


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100