RENEWABLE ENERGY CONTRACTS A BRIEF OVERVIEW


Contracts for the provision of goods and services leading to the commissioning and maintenance of a renewable energy system, be that a wind turbine, hydro turbine, solar installation, Biomass system, etc all need careful consideration in terms of content and structure.


PROTECTION the final overriding Contract must protect the consultant from risk and reflect the factual process of leading into and procuring the project through feasibility, installation, commissioning and maintenance. On the other hand reasonable legal protection should be afforded to the client as regards correct duties of care for the services provided and correct warranties for the goods supplied, thus underpinning the provision of and performance of the system over time. Also, the documentation presented by the consultant should be as clear, concise and “user friendly” as possible.


INITIAL VISIT TO SITE AND INITIAL DISCUSSIONS • Outline Services – site assessment, measurement, planning application, outline of goods and services, initial return on investment ideas for parties, production of a report to lead to next phase


• Detailed Service – seasonal measures, specialist studies, detailed specification of goods and services, detailed performance specifications re downtime etc, dealing with planning conditions, details of project services and maintenance services, cash flow plan, production of a report to lead to next phase


• Project Services – all services to lead to installation and commissioning and for utility company and network operator involvement and takeover


• Maintenance Services – ongoing maintenance re cost in use relative to performance over time and avoidance of downtime etc


the above example is fairly basic and for illustrative purposes only, but, from this example, it is important to appreciate that each of these phases should give rise to a series of independent contracts working incrementally forward on the project and working in synchronisation with the Overriding Contract


These incremental phases need to be carefully worked through between the consultant and the client and all need to be subject to an Overriding Contract between consultant and client containing key clauses relating to sale of goods and provision of services with particular care as to...


TYPICAL PROJECT


Take a typical project for say, the provision of a wind or hydro turbine to a user like a farmer. In this process, one might reasonably expect a series of phases as follows...


• Any selection of goods or design service • Commissioning • Charges and payment, warranties as to goods supplied for the benefit of the client and any reasonable exclusion or reduction of liability clauses for the benefit of the consultant


• Financial arrangements including FIt sharing and return on investment formula after dealing with any domestic consumption of electricity by the client


• Grant of Lease and draft Specimen Lease • Maintenance • timing for completion of installation • planning and other statutory requirements


80 www.windenergynetwork.co.uk


• provision of information between client and customer


• Delivery and risk transfer in the goods • Confidentiality and intellectual property • Llimitation or exclusion of liability as far as legally permitted


• Assignment and sub contracting • Force majeure i.e. unforeseen circumstances which may delay the project


• possible right for client to cancel contracts on consumer credit grounds


• other clauses


Most importantly the Overriding Contract must carefully regulate the progression of the above phases between the parties, by specifically controlling when the individual contracts for the individual phases arise and are concluded, so the parties are free and clear to deal, if they both wish to, and move onto the next phase.


SIMILARITIES TO CONSTRUCTION AND ENGINEERING CONTRACTS Renewable Energy Contracts are to a large degree similar to construction and engineering contracts in that properly drafted they should control the risk relative to the best outcome in time, quality and money. However, of major difference is the lead in and project planning phases which are rarely allowed for contractors to participate in (apart from quickly coming up with cost saving ideas and value engineering etc) on mainstream contracting and engineering projects.


one major similarity does exist between mainstream contracting and engineering projects and Renewables projects. In that the more timely, quality and detailed the information, worked up at the outset, relative to a detailed scope of services and goods for a clearly related price, the fewer claims, the fewer misunderstandings and the better the job.


Denison till have many years experience in drafting traditional engineering and construction contracts and have been involved in drafting and negotiating an increasing number of renewables contracts for wind turbines, hydro turbines and solar power installations.


Gareth Hevey, Denison Till www.denisontill.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116