SPONSORS OF TYNE & TEES FEATURE MOVING PICTURES
Almond Productions are a North-East based video production company specialising in working with engineering and offshore related organisations. They are a team who are passionate about making video that is not only good quality, but can convey the right message for their clients.
HISTORY AND LEADING CLIENTS Almond productions was set up just over 10 years ago by Almond Kellacher who was initially trained in the broadcast industry. The team has now grown and each team member has a professional qualification in their specialist area.
previous clients include Amec, bp, Mammoet and tyne tunnel 2 amongst
others. Having produced video for the oil, gas and construction industries they are keen to offer their bespoke services to the wind energy and renewables sector.
WHY VIDEO? Video has become the most powerful and effective communications tool of the last 100 years. Video on the Internet is growing quickly, and viewing content online has actually surpassed traditional television viewing. Video included on a website not only portrays a visual message but also aids Google searches and can become a part of search engine optimisation.
There may be many reasons that a company might choose to engage with video. Video can show a product or service in action, and for large engineering projects this means that their large scale projects can be showcased not only to investors, but to other interested parties quickly and easily.
Video can also help you reach markets, or locations that could be difficult or costly for live training or speakers to reach, with the added bonus of a consistent message to all who view it.
FURTHER ADVANTAGES Apart from ‘showing’ an aspect of a project or a completed construction in full working order, video also has the advantage of being able to tell a story and engage with audiences on a deeper level. Because of this, the company likes to work closely with their clients to make sure that the finished video meets all of its objectives, especially in terms of getting the right message across. This may include design and construction of a wind farm, and add value to in-house training.
RETURN ON INVESTMENT All of these aspects benefit from having a well thought out plan for the video which they can help to develop. Like many engineering projects video production can work in a similar way, the more front end research and development the stronger and better the outcome. All of which makes for a good return on investment.
COMPUTER GENERATED IMAGERY (CGI) Almond productions recognises that sometimes it is difficult to film operations such as the inner workings of a piece of machinery or underwater drilling. To overcome this they can now incorporate CGI into video to create a realistic view of what the operation actually looks like.
Almond Productions
www.almondproductions.co.uk
FOR MORE INFORMATION PLEASE CALL: +44 (0) 1748 828580
E
sales@subenesol.co.uk W
www.subenesol.co.uk www.windenergynetwork.co.uk 37
Service and Quality is Never an Accident It is Always the Result of Intelligent Effort
SUBFLEX ™ Cable Protection Systems
SUBSEA ENERGY SOLUTIONS HAS BEEN FOUNDED AS A DIRECT REQUEST FROM THE RENEWABLE ENERGY INDUSTRY FOR THE NECESSITY FOR INCREASED COMPETITION, REDUCED SYSTEM COSTS AND ENHANCED SOLUTIONS, WITHIN A LIMITED CABLE PROTECTION SYSTEM MARKET PLACE.
DEMAND FOR COST REDUCTION Subsea Energy Solutions, an ISOQAR 9001 : 2008 registered company, has risen to the urgent industry challenge for the demand for offshore wind farm long term sustainability, through means of cost reduction.
With industry assistance, Subsea Energy Solutions can signifi cantly contribute towards the reduction of offshore wind farm design, construction, operational, maintenance and de-commissioning costs.
EXPERIENCE & INDUSTRY ADVICE With our industry and project wide experience, the unique patent pending SUBFLEX TM
System offers many unrivalled and unparalleled technical and commercial features.
advice during the development of the SUBFLEX TM
Subsea Energy Solutions have sought industry Cable Protection System and taken into
consideration many requirements such as purchase cost, rapid offshore assembly, rapid installation, rapid burial, enhanced cable protection, elimination of maintenance requirements, standardisation of components to name just a small selection of features.
CABLE INSTALLATION IMPORTANCE Offshore windfarm cable installation is a high cost / high insurance claims theatre and it is well documented that 70% of insurance claims from windfarm operators relate to cable damage, so there has never been a greater, more important time, for the renewable industry to come together and support a rapidly emerging company in developing a fully coordinated and fully standardised approach to monopile J-tube & J-tube-less installations.
Cable Protection
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116