FAN COILS AND CHILLED BEAMS
Centralised control
When Ability Projects built a new purpose-built facility in 2016, it provided the perfect opportunity not only to showcase its own fan coil units (FCUs), but to demonstrate the product’s potential for seamless integration with renewable heating technologies too.
A
bility Projects, recognised throughout the H&V industry as experts in the design, manufacture and worldwide distribution of energy efficient FCUs, incorporated a suite of offices in its new factory facility that would require zoned control of heating and cooling for complete control and comfort.
Working closely with Dimplex’s in-house heating design team, the manufacturer developed a unique centralised control solution, incorporating a Dimplex air source heat pump and solar PV technology.
Offering heating and cooling without any refrigerant pipes passing around the building, the system also includes heat recovery via the use of reversible air source heat pumps, which enables Ability Projects to use waste heat from cooling for hot water production.
Peter Lowther, managing director of Ability Projects, said: “This was a unique opportunity to create a large scale heating and cooling system, which leverages the latest technology to ensure it is easy to control, highly efficient and cost effective – despite its complexity.
“We were able to work closely with Dimplex’s own engineers who recommended the air source heat pumps.
“They looked at the zoned control we needed, specified and then delivered a robust response that consisted of our FCUs, the PV system we had selected and their heat pumps. “The system has worked extremely well, ensuring a comfortable working environment and, together with a performance review which has helped to refine the system, it has really delivered beyond initial expectations.”
Design excellence
Dimplex’s in-house heating design service was critical to the specification, calculating the total heating and cooling loads and zoning the system based on the office floor plan layout. Tasked with ensuring temperature control in individual zones, Dimplex specified a four pipe heating and cooling system, with two Dimplex LAS12TUR+ reversible air source heat pumps and two Dimplex 500 litre cold and hot buffer tanks. Ability Projects’ NR35 FCUs were selected to provide extremely low noise, with low velocity grilles to maximise system performance and comfort for occupants. The FCU controls ensure that the air temperature which is discharged above the occupants is maintained within strict temperature bands.
Dimplex’s technical experts commissioned the system, before completing a handover that included user training for staff at the new Ability Projects facility. Installation was completed by SHS Building Services.
A number of considerations were made to maximise the performance and efficiency of the system, including smart controls which enable it to adapt to user occupancy to reduce pumping requirements from the buffer tanks during quieter periods.
The Dimplex air source heat pumps are designed to work with 45 degrees heating flow and 12 degrees cooling flow, maximising the co-efficient of performance (CoP) during both heating and cooling modes. Each heat pump was supplied with integral heat meters and installed in
conjunction with a centralised system controller, which allows for the end-to-end monitoring of both energy and occupant comfort. In order to minimise the pumping and heat losses from the pipework, the heat pumps were also situated immediately adjacent to the plant room wall. This minimised the length of pipe run and the parasitic power consumption related to the system.
In addition, the system performance was reviewed three months after installation and further savings were enabled by optimising the controls. The comfort of the occupants was then surveyed to ensure that the expectations for their working environment was fulfilled. Christian Hadley, installed product marketing manager, Dimplex said: “This is a unique system which offers heating and cooling without any refrigerant pipes passing around the building. This makes future adaptions to the system easier, allows a plumber to install the system and overcomes the requirements of room size versus practical limit.
“The Dimplex units also offer heat recovery, so Ability Projects is able to use the waste heat from cooling for hot water production.
“The building also incorporates PV technology and bespoke Ability Projects FCUs which were designed to integrate seamlessly with the Dimplex heat controller.
“By working closely together, Dimplex and Ability Projects have been able to maximise the performance of our own market leading products and develop a bespoke centralised control solution which provides end-to-end controller intelligence.”
www.acr-news.com June 2017 41
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120