This page contains a Flash digital edition of a book.
Learn Discuss Network Railtex


 11th


 Socomec STATYS range Harness the power of interaction


     





  


Media Partners 


During the course of one month and in challenging conditions, Socomec tested and commissioned nine UPS systems and eight emergency lighting central power supply solutions. Furthermore, Socomec worked closely


with the NGBailey project managers to identify opportunities to provide additional solutions to facilitate the installation. Nick Golder, Socomec project manager


says: ‘On the emergency lighting inverters the electrical design had two supplies - mains and generator - to each module via an automatic changeover switch (ATS). The ATS was required to signal the gen-set to start in the event of a mains fail, and transfer the supply to the UPS module from the mains to the gen-set. Due to the limited space available for the switchgear, the integration of a Socomec ATS in the external maintenance bypass switch was proposed. This meant that a compact single solution was provided, which saved a significant amount of space and reduced installation costs.’ Paul Lowbridge, project manager for


Socomec commented: ‘The Socomec and NGB teams worked extremely well together: Socomec thoroughly enjoyed working with NG Bailey on this complex project. Socomec was particularly impressed with the collaborative and constructive approach, and the flexibility and professionalism of the teams in response to the unique challenges of this installation.’ Even once installed, requirements changed and Socomec was requested to alter the configuration of the emergency lighting UPS from ‘maintained’ to ‘non- maintained’ outputs. Socomec and NG Bailey worked tirelessly to make this late change without delay, working to reverse the alteration when requirements changed.


Andrew Wilkinson, Socomec regional managing director explains that a broad range of integrated products and services have been developed to address what are considered to be four of the most critical power related issues: availability, efficiency, capacity and flexibility.


‘Socomec is increasingly looking at


how it can integrate technology from each of its four business applications – critical power; energy efficiency; power control and safety and solar - in order to provide systems that improve the performance of critical buildings. ‘The supply of reliable, cost-effective


power which can be scaled to meet the rapidly changing capacity demands of a critical infrastructure is the foundation upon which our clients’ businesses are built. Socomec invests heavily in pioneering research and product design in order to deliver world-class innovations that solve its customers’ greatest challenges in terms of energy efficiency, reliability, business continuity and Total Cost of Ownership (TCO). It is excited to be able to offer fully integrated solutions, drawing on the wealth of knowledge and skills from each highly specialised division of Socomec.’ Socomec has developed an advanced


critical power solution - the IP+ Rail range - designed specifically for the uniquely demanding requirements of rail sector applications. This range represents the latest in UPS technology for the mass transportation sector, ensuring the safe and reliable operation of rail networks and infrastructure. ‘Socomec recognises that much of


the equipment used in the UK rail sector was at least two generations behind the critical power systems being sold into industrial and data centre applications,’ says Andrew Wilkinson. ‘It has developed


a system specifically for UK rail and underground applications, using its ruggedised industrial IP+ unit as a platform. TCO is increasingly important in the mass transport sector: Socomec is committed to developing complete critical power solutions which not only provide outstanding performance but also deliver exceptional value throughout their lifecycle.’ With unprecedented numbers choosing to travel by rail, the ongoing performance of the installed systems is vital. Socomec’s dedicated critical power engineering team is responsible for ensuring business continuity, optimising efficiency and guaranteeing the safe performance of the UPS and emergency lighting systems at King’s Cross. Wilkinson explains: ‘The company understands the importance of maintaining vital equipment while also maintaining control of a facility’s operating costs. Socomec has created a completely customised Commissioning, Inspection and Maintenance (CIM) package for the King’s Cross system architecture.


High quality engineering support is a vital component in any business continuity plan and is, unfortunately, often overlooked until something goes wrong.’ ‘Socomec believes that a holistic


approach to maintenance is imperative in order to achieve the very best performance from a system as well as to make the ongoing system management as easy as possible,’ concludes Andrew Wilkinson. Further information from Sarah Condie, marketing manager. Tel: 01285 863300. E-mail: rail.ups.uk@socomec.com www.socomec.com


April 2013 Page 67


Register


Now for free at www.railtex.co.uk


save £20 on the door


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204