News Velway Appointed as New Facilities Management Provider for Thorpe Park Leeds Thorpe Park Leeds
Strategically located at Junction 46 of the M1 and connected directly to Leeds city centre via the new East Leeds Orbital Route and Thorpe Park Railway Station (opening 2025), Thorpe Park Leeds is a flag- ship development within Scarborough Group International’s (SGI) growing national portfolio. With more than 100 businesses already established on site, from major corporates to fast-growing regional SMEs, the estate continues to evolve as a magnet for investment, innovation and talent.
This contract further strengthens Velway’s positive and collaborative relationship with SGI, as they continue to deliver exceptional service across their national portfolio, spanning locations from Edinburgh and Manchester to Newport.
No.1 The Square
Leading property management and compliance company, Velway, has been appointed as the new Facilities Management (FM) provider for the prestigious Thorpe Park Leeds – one of the North’s most significant and successful mixed-use business destinations.
The contract includes the delivery of comprehensive FM services across the 1.4 million square foot estate, covering security, health and safety, cleaning, general upkeep, repairs and maintenance. Velway will work to ensure that the estate remains a modern, vibrant, and sustainable environment for the hundreds of businesses, work- ers, and visitors that use the space daily.
The estate has seen rapid transformation in recent years, with new commercial, residential, and retail and leisure developments helping to realise its long-term vision of becoming a connected, sustainable community where people can work, live and thrive.
The next phase of development will see a further 1.6 million sq. ft of mixed-use space added, alongside 450 new homes, reinforcing Thorpe Park’s position as a leading mixed-use destination.
This latest contract adds to Velway’s roster of high-profile clients which includes National Care Group, global technology company, Ideagen, and RBH Properties.
For more details visit:
www.velway.co.uk
Integrated heating specialist overhauls metering system to future-proof property management and billing at prestigious residential development
WilSon Energy, a leading provider of fully integrated Heating, Metering, Pre-Payment and Billing & Bureau Services, has carried out a full audit and replacement of the heat metering system at a high spec residential development in Bath.
North Range is a prestigious new build development located in Bath’s Artisan Quarter situated on the historic Old Walcot Yard. The col- lection of nine contemporary, lateral and duplex apartments had been completed, incorporating a centralised heat network plant with modular gas boilers.
Each property has a Heat Interface Unit (HIU) with an energy meter, with a hard wired Mbus output. After all the properties were com- pleted, sealed and tenanted it was handed over to the property man- agement company to manage the building and associated billing. It was soon discovered that there was no means of remotely collecting data on energy usage at each of the properties.
The only option was to go door to door to collect meter readings, which led to issues with access, lack of accurate billing and no way to resolve any queries regarding energy consumption for tenants and occupiers.
Andy Wilkinson, CEO at WilSon Energy, explains: “A combination of mis- specification and a lack of awareness about billing on property, once complete, led to several issues for the property management company. There was no cable network or any data logging devices installed, so there was no remote way to connect to gather meter readings.”
After completing a full audit of the heating system, WilSon Energy engineers found that the original meters supplied with the HIUs were low cost, with a single output which could not be connected, as the meters would not accept interchangeable modules.
10
The WilSon Energy solution included replacing all heat meters with wireless MBus, enabling remote data monitoring and a central data collection device. This removed the need for manual meter readings and meant that access into the properties was no longer required. It also provided hourly updates on usage, ensured and accurate billing for residents.
Andy Wilkinson continues: “It is very common that metering and bill- ing gets forgotten about during the construction phase. The original developer designs the project, specifies the equipment and neither the designer nor contractor has considered the future management of the property.
A lack of foresight, knowledge and planning leads to additional costs for new meters and the required installation. This causes problems with ongoing management and maintenance for property or build- ings management teams as well as residents.
That’s why we like to work with design teams at the commission- ing stage to help specify the right heat network and the associated metering, data collection and billing solutions.”
Now that the new wireless metering system is in place, WilSon is also working on behalf of the property management company to provide billing and bureau services to ensure accurate billing and maximising returns on energy costs.
As an established energy procurement specialist, WilSon has also secured a better energy supply deal, providing overall savings and reducing costs to residents.
For more information about WilSon Energy’s heat network, smart metering, billing and bureau services, visit:
www.wilsonenergy.co.uk
COMMERCIAL PROPERTY MONTHLY 2025
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84