SPONSORS OF REGIONAL FOCUS
STEEL RIVER CONSULTANTS – A LEADING QUALITY HEALTH AND SAFETY CONSULTANCY APPOINTS PRINCIPAL CDM-C CONSULTANT
Steel River Consultants has made a strategic appointment to its team based in Teesside, strengthening the company’s position in the field.
RESPONSIBILITIES
Chris Dixon from County Durham, will undertake the roles of safety consultant and CDM Co-ordinator, where duties will include providing construction health and safety advice and the provision of site safety auditing of construction phase health and safety performance.
HEALTH AND SAFETY BACKGROUND Formerly a principal consultant with Turner and Townsend, Chris comes from a strong health and safety background having provided services for a large client base on a range of projects, from national rollout schemes, to frameworks and large scale new build construction and refurbishment. Chris is keen become involved in Steel River Consultants’ current projects and aims to champion further business development within the region.
Chris explains, “I am delighted to have joined Steel River Consultants, which has an excellent reputation in health and safety consultancy support services, especially in onshore and offshore renewable energy sector.
“The varied portfolio of experience on projects I have accumulated during my career to date will provide me with the opportunity to offer Steel River Consultant’s clients a highly professional service. Additionally, I anticipate playing an active role in business development and will be looking to develop opportunities in the renewables, oil and gas sectors.”
Graham Tyerman said, “This recent appointment to Steel River Consultants will be a valuable resource to the organisation. I am confident that with Chris’ experience and expertise we can really take the business forward and in doing so will significantly strengthen our capabilities.”
MCNULTY OFFSHORE CONSTRUCTION LTD
McNulty Offshore Construction Ltd has been a European leader in the fabrication, installation and refurbishment of offshore structure, FPSO’s and semi-submersibles for the past 25 years.
WIND ENERGY INDUSTRY The company is now also engaged in Greenfield and Brownfield developments in the UK continental shelf and are at the forefront of EPC contracts for offshore renewable energy windfarms, specialising in the design and fabrication of jackets and offshore sub stations.
REPUTATION AND EXPERIENCE The management team have a reputation for delivering fast track and complex projects on time and to client specification, with stringent safety procedures that result in a first class track record within the offshore industry.
FACILITIES
Their fabrication facility in South Shields is 2km from the mouth of the River Tyne and covers 90,000m², with a river frontage of 580m at the main quay. The
88
www.windenergynetwork.co.uk
water depth ranges from a minimum of 8.6m - 11.2m to a maximum of 13.5m – 15.5m depending on the tide. Offering craneage, fabrication sheds, drawing offices, stores and 3,700m² of office accommodation, South Shields site can easily accommodate a number of projects simultaneously
The image shows the extent of the McNulty facility, including pipe shops, fabrication shops, assembly hall, fabrication / laydown areas and load out quays.
McNulty Offshore Construction Ltd
www.mcnultyoffshore.com
e = See enhanced entry online
Steel River Consultants
www.srconsultants.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148